Privacy Policy
Version 3 · 31. Oktober 2026
Für dieses Dokument gibt es noch keine deutsche Übersetzung, deshalb wird es in einer anderen Sprache angezeigt. Rechtlich verbindlich ist die türkische Fassung.
The ModernMes service (the "Service") is provided by Modern Yazılım ve Bilişim Teknolojileri San. ve Tic. Ltd. Şti. ("Modern Yazılım", "we"). This policy explains which personal data is processed when you visit modernmes.com, use the ModernMes panel at app.modernmes.com or use the ModernMES mobile app (Android and iOS), why it is used, who it is shared with and how it is protected. For our notice under Turkish Law No. 6698 on the Protection of Personal Data (KVKK), see the KVKK Notice.
1. Our roles: controller and processor
Panel accounts and billing: Modern Yazılım is the controller of the account, contact, session and billing data of the company that signs up for the Service and of its panel users.
Production and operator data: The Customer is the controller of the production, machine and operator data it enters in the panel or transfers from its machines and systems; Modern Yazılım processes that data only on the Customer's behalf and instructions, to provide the Service, as a processor. The Customer is responsible for informing its employees (operators) and for having a legal basis for processing their data.
2. Data we process
2.1 Panel users and the account holder
- Identity and contact: first and last name, e-mail address, phone number, company name
- Account: user role and permissions, password hash (the password itself is not stored), two-factor authentication setting
- Session and security records: sign-in times, last sign-in IP address, failed sign-in attempts, audit records of actions in the panel
2.2 Operators (employee data entered by the Customer)
- Name, employee/operator code, optional e-mail and phone
- Card (RFID/barcode) number and PIN for terminal sign-in
- Assigned shift, sign-in and sign-out times
- Production and downtime records of the jobs the operator starts, pauses and finishes
2.3 Operator phones
The Customer can pair an operator's personal or company phone with that operator using a QR code created in the panel. For a paired phone we record: the device name and a device/model label derived from the browser information (user agent), when and by whom it was paired, when and from which IP address it was last used, whether it has been revoked, and which device sent each job start/pause/finish signal. Managers can see summaries of phone use from these records. The phone's location, contacts and other data on the phone are not collected.
2.4 Machine and production data
Machines, work orders, operations, parts, routings, quality and maintenance records, machine signals and the durations, OEE and reports derived from them, and files uploaded by the Customer.
2.5 ERP connection details
When the ERP Connection is used, the address, user name, password or API key the Customer enters to connect to its ERP system. Secret fields are stored encrypted (AES-256-GCM), are never shown again in the panel and are used only to transfer data to the Customer's own ERP.
2.6 Billing and payment
Subscription plan, billing period, billing name, tax office and number, billing address, invoice and payment records. Card details are not collected or stored by ModernMes; they are processed directly by PayTR Ödeme ve Elektronik Para Kuruluşu A.Ş. or, for US dollar and euro payments, by Stripe.
2.7 Website visitors
modernmes.com uses Cloudflare Web Analytics to count visitors. It uses no cookies or local storage, does not identify visitors and does not track them across sites; it reports only aggregate counts of the page address, referring site, browser and device type, country and page load time. It is provided by Cloudflare, Inc. and is subject to Cloudflare's privacy terms. No advertising or remarketing tools are used. Like any web server, our servers may keep technical access logs (IP address, time, requested address) for security and troubleshooting.
2.8 The ModernMES mobile app
The ModernMES mobile app lets panel users follow the plant status, machines, stops, running jobs and alerts on their phone and enter reasons for stops. You sign in with your existing panel account; no account is created in the app. The production data shown in the app is the data in 2.4. In addition:
- Sign-in and session: Your e-mail address and password are sent to our server to sign you in; the password is not stored on the phone. Session tokens are kept in the phone's secure storage (Android Keystore / iOS Keychain) and deleted when you sign out.
- Notifications: If you allow notifications, your phone's push token, operating system, app version and language setting are stored with your account and used only to send you alerts. Notifications are delivered through Expo's push service (650 Industries, Inc., USA) to Google's (Firebase Cloud Messaging) and Apple's (Apple Push Notification service) notification services; the notification's title and text (for example the name of a stopped machine and how long it has been stopped) pass through these services. The push token is deleted when you sign out. You can turn notifications off at any time in your phone's settings.
- Camera: The camera is used only to read QR codes and barcodes, when you open the Scan screen. No image is stored or leaves the phone; only the text of the code is sent to our server to find the matching record.
- Usage statistics: We use Google Analytics for Firebase (Google LLC) to understand how the app is used. It receives the screens opened (only the kind of screen, never which machine or record), fixed codes for a few actions (a reason was entered for a stop, with the reason's type and whether a note was added; the kind of record found by a scan; the type of notification opened; the "all clear" screen being shown), and what Firebase adds itself: an app-instance id, the app and operating system version, the device model and session length. Your name, e-mail, your company's or machines' names or codes and any notes you write are not sent, and no user id is assigned to you. The advertising ID is not collected, and the data is not used for advertising or ad personalisation. You can turn this off in the app under Settings → Privacy → Share usage statistics; sending then stops and the analytics data on the phone is deleted.
- The app does not access your location, contacts, microphone, photos or files, and shows no ads.
3. Why we use the data
- Creating the account, authentication and authorisation
- Providing the Service: production tracking, reports, estimates and notifications
- Delivering alerts to the mobile app as push notifications
- Understanding and improving how the mobile app is used (usage statistics, which you can turn off)
- Subscription, billing and payments
- Technical support and customer communication (e-mails about the account, invoices and the Service)
- Security of the Service, preventing abuse and automated (bot) sign-ups
- Meeting legal obligations
Your data is not used for advertising and is not sold to third parties.
4. Tenant separation
ModernMes is a multi-tenant system. Each customer's data is separated by its own tenant id; the separation is enforced in the database with row-level security policies, and the tenant id is taken from the signed-in user's authentication token, never from the client. One customer's data cannot be accessed on behalf of another customer.
Derived information such as duration estimates and operation sequence suggestions is calculated only from the Customer's own history and is never combined with other customers' data.
5. AI features
Duration estimates, routing suggestions and sequence checks run entirely on ModernMes servers with the Customer's own data; no data is sent out for these features.
The AI assistant (included in the Enterprise plan) and drafting records from free text use the Claude language model provided by Anthropic, PBC (USA). These features are off by default; they do not work until the Customer's administrator approves the data transfer in the panel, and that approval can be withdrawn in the same place.
When the assistant is used, the user's question (typed or spoken; for speech, the text the browser transcribed, not a recording) and the records the assistant reads to answer it (for example work order, machine, project, customer and operator names, production, downtime and OEE data) are sent to Anthropic to generate the answer. Anthropic does not use data received through its API to train its models. The assistant does not change records by itself; the new records it proposes are created only when the user confirms them. Conversations are kept in the user's account and can be deleted by the user.
6. Service providers and transfers
Personal data is shared only with the following service providers, and only to the extent the service requires:
| Provider | Purpose | Data shared |
|---|---|---|
| PayTR Ödeme ve Elektronik Para Kuruluşu A.Ş. | Card payments (3-D Secure) | Amount, order number, name, e-mail, phone, address; card details are entered directly on PayTR's page |
| Stripe | Card payments in US dollars and euros; keeping the card for automatic renewal | Amount, order number, company name, e-mail; card details are entered directly on Stripe's page and kept by Stripe |
| Cloudflare, Inc. (Turnstile) | Bot checks on the sign-up, sign-in and password reset screens | IP address and browser/device signals |
| Resend | Sending account, invitation, notification and invoice e-mails | Recipient's e-mail address, name and the e-mail content |
| Expo (650 Industries, Inc.) | Sending push notifications to the mobile app | Push token and the notification's title and text |
| Google LLC (Firebase) | Delivering notifications on Android (Firebase Cloud Messaging) and mobile app usage statistics (Google Analytics for Firebase) | Push token and notification content; app-instance id, kinds of screens opened, action codes, device model, app and operating system version |
| Apple Inc. (APNs) | Delivering notifications on iPhone | Push token and notification content |
| Hosting (server) infrastructure | The servers and database ModernMes runs on | All data processed in the Service |
| Anthropic, PBC (only if the administrator approves) | AI assistant and drafting records from free text | The user's question and the production records the assistant reads to answer it |
Stripe, Cloudflare, Resend, Expo, Google, Apple and Anthropic are based outside Turkey; transfers to them are made in accordance with Article 9 of Law No. 6698. Apart from these, data is shared with competent public authorities only under a court order or a legal obligation.
7. Security
- All connections to the website, the panel and the mobile app are encrypted with HTTPS (TLS).
- Passwords are stored as one-way hashes; ERP connection passwords and two-factor authentication keys are stored encrypted.
- In the mobile app, session tokens are kept in the phone's secure storage; the password is not stored on the phone.
- Card details never reach ModernMes servers.
- Actions in the panel are recorded in audit logs; repeated failed sign-ins require an additional check.
8. Retention
Your data is kept while the subscription and account are active. When the subscription ends or the account is closed, the data is kept for 30 days so the Customer can export it, and is then permanently deleted. The mobile app's push tokens are deleted when you sign out; usage statistics are kept in Google Analytics for at most 14 months. Records that must be kept by law, such as invoices and payment records, are kept for the legally required period. Detailed periods are in the KVKK Notice.
9. Your rights
Under Article 11 of Law No. 6698 you have the right to learn whether your data is processed, to request information, to ask for it to be corrected or deleted, to know the third parties it was transferred to and to object to its processing. Requests about production and operator data should be made to the Customer (the company you work for), as the controller of that data; we support the Customer in fulfilling them. The mobile app has no separate account: you can ask for your account to be deleted by your company's administrator in the panel or at the contact address below.
10. Changes
When this policy is updated, the new text is published on this page and the "Last updated" date changes. Material changes are notified to account holders by e-mail.
11. Contact
- Company: Modern Yazılım ve Bilişim Teknolojileri San. ve Tic. Ltd. Şti.
- Address: Nisbetiye Mah. Gazi Güçnar Sok. No:4/2, Beşiktaş / İstanbul, Turkey
- Phone: +90 212 337 3630
- E-mail: info@modernyazilim.com
Fragen zu diesem Dokument
Modern Yazılım ve Bilişim Teknolojileri San. ve Tic. Ltd. Şti.
Nisbetiye Mah. Gazi Güçnar Sok. No:4/2, Beşiktaş / İstanbul
0212 337 3630 · destek@modernmes.com