Evocon alternative: Evocon vs ModernMES compared

Evocon and ModernMES both show OEE and downtime, but they start from different places. Evocon is OEE and production monitoring software that reads machine signals through its own device and is priced per machine. ModernMES is an MES that runs on work orders and operator terminals and is sold per plan. This page compares the two on scope, machine data, price and fit. The Evocon details come from Evocon's own website, checked on 1 November 2026.

Last updated: 2 November 2026

The short answer

Evocon is a good choice if what you mainly want is automatic OEE from machine sensors on lines that run long batches, and a per-machine price works for you. Look at ModernMES if your problem is following jobs, routings and orders through the shop, you want OEE and downtime as part of that, and you want to start without buying hardware.

Evocon and ModernMES side by side

EvoconModernMES
What it isOEE and production monitoring softwareMES for job shops and small and mid-sized plants
Price model€189, €249 or €319 per machine per month on a one-year agreement, billed yearly. €159 to €269 on three years.Plans with a machine and user limit, monthly or yearly. Current prices are below.
Machine dataEvocon's own device at €19 per device per month. Sensors and cables are bought separately. Data can also come in by API or an integration.Operators start, pause and finish jobs on a terminal or phone. Optional machine signals over HTTP or MQTT from ModernMES Connector, a PLC gateway, Node-RED or a sensor box. No device of its own is needed.
Work orders and routingsProduction orders are imported from the ERP. Routings are not mentioned on the site.Projects, routings and one work order per operation
QualityScrap with reasons, automatic scrap monitoring on Professional, quality checklistsQuality checks, defect types, SPC and nonconformance reports
MaintenanceMaintenance checklists and integrations with maintenance systemsMaintenance plans, the orders opened from them and overdue alerts
Lot traceabilityNot listed on the siteMaterial and production lots, genealogy, lot labels, on Enterprise
StockNot listed on the siteStock module on Professional and up, with a bill of materials, lot receipts and automatic consumption from finished jobs
SchedulingNot listed as a featureA planning board that places jobs on machines over time
UsersUnlimited users in every licenceA user limit per plan. Operators who sign in at a terminal do not count.
Where it runsCloud, on AWS in the EU. No on-premise option is listed.Cloud, or your own server
Free trial30 days, with one device lent14 days
LanguagesOver 20, including Turkish and Hungarian. Some only on the operator screen.Turkish, English, German, Hungarian and Italian

Where Evocon is stronger

  • Machine data comes from sensors from day one. Run and stop records do not depend on operators remembering.
  • Every licence has unlimited users.
  • The trial runs for 30 days, with a device lent for it.
  • The Enterprise package adds multi-factory management and a quarterly OEE review.

In ModernMES part counts can also come from the machine signal. The signal carries the count the machine made, and on machines whose counting is set to Machine that count is written to the running job. On other machines the operator enters it. The signal comes from ModernMES Connector on a computer in the factory, from a PLC gateway or from a sensor box. You do not have to buy a device of ours, but the machine has to be able to give its state and counter.

Where ModernMES is stronger

  • It manages the work itself. Orders become projects, routings become one work order per operation, and quotes and deliveries sit in the same place.
  • You start without hardware. The operator terminal is a tablet or a PC, and machine signals can be added later.
  • The price is per plan, not per machine. Monitoring 10 machines on Evocon Basic with a one-year agreement costs €1,890 a month plus €190 for the devices. ModernMES Professional is one plan price for up to 25 machines.
  • Quality, maintenance, lot traceability and stock come as modules of the same product. Maintenance and stock are on Professional, lot traceability on Enterprise.
  • It can be installed on your own server. Ready ERP connections cover Logo, Mikro, Netsis, DIA, Paraşüt, SAP, Business Central and Odoo. The ERP connection is included in Enterprise and can be added to the other plans.

ModernMES prices

The smallest plan, Starter, costs €27.99 / $29.99 a month for 5 machines and 3 users, or €23.25 / $24.92 a month billed yearly. Professional costs €59.99 / $64.99 a month for 25 machines and 15 users, or €49.92 / $54.08 a month billed yearly. Enterprise costs €115 / $125 a month for unlimited machines and unlimited users, or €95.83 / $104.17 a month billed yearly. With all 25 machines in use, Professional works out to €2.40 / $2.60 per machine per month. There is no setup fee, operators who sign in at a terminal do not count as users, and every plan comes with a 14-day free trial. Prices exclude taxes.

Try free for 14 daysNo credit card needed. Nothing is charged when the trial ends unless you choose a plan.

Evocon's prices do not include the device, sensors, cables, integrations or on-site visits, and its site does not say whether VAT is included. There is a wider comparison in MES software pricing.

How to decide

  1. Write down the problem. Is it that you do not know how much the machines run, or that you do not know where each job is?
  2. Count your machines and the people who will sign in, and work out both price models with your own numbers.
  3. Check whether your machines can give a signal. If they cannot, operators will enter the data.
  4. Try both with your own data during the trials. The pilot plan in how to choose MES software helps.

Frequently asked questions

Is there a cheaper alternative to Evocon?

It depends on the price model. Evocon starts at €189 per machine per month, and the device is charged separately. ModernMES is priced per plan, and the price stays the same as long as your machines fit the plan's limit. For shops with more than a few machines the plan price usually comes out lower.

Does ModernMES need sensors like Evocon?

No. The data comes from the start, pause and finish records operators enter on a terminal. If you want, machine signals can be added over HTTP or MQTT so stops are caught without anyone recording them. If you set a machine's counting to Machine, part counts come from the signal too. Otherwise operators enter them.

Can Evocon and ModernMES be used together?

There is no ready-made connection between them. They focus on different jobs, so they can run side by side, but decide up front which one records what, so nobody enters the same stop twice.