Free production tracking templates
Spreadsheets for shops that track production in Excel. Each file comes with sample rows, working formulas, drop-down lists and print settings. Download them without giving an email address.
Production Tracking Spreadsheet: Free Excel Template
Free production tracking spreadsheet for Excel. Log machine, operator, work order, time, good and scrap counts. Scrap rate and machine totals are built in.
Read moreDowntime Tracking Template for Excel (Free)
Free machine downtime tracking template. Log when a machine stopped and why, and get minutes, groups and a Pareto by reason from the built-in formulas.
Read moreScrap Tracking Template for Excel (Free)
Free scrap tracking template for Excel. Log scrap count and reason per job, get scrap rate and scrap cost, with totals by reason and by machine.
Read moreOEE Excel Template: Free OEE Calculation Spreadsheet
Free OEE Excel template. Availability, performance, quality and OEE per shift from built-in formulas, with a time-weighted OEE per machine.
Read moreWork Order Template for Excel & PDF (Free, Printable)
Free printable work order template in Excel and as a blank PDF. Routing with planned and actual time per operation, plus a work order list that tracks due dates.
Read moreCNC Job Tracking Spreadsheet: Free Excel Template
Free CNC job tracking spreadsheet for Excel. Planned and actual setup and cycle time per job, good and scrap counts, and the variance from plan worked out for you.
Read moreCapacity Planning Excel Template (Free)
Free capacity planning template for Excel. Weekly capacity per machine group in hours, the load of each job and a six-week load table that flags overloaded weeks.
Read moreProduction Schedule & Calendar Template for Excel (Free)
Free production schedule and production calendar template for Excel. Gantt bars, a monthly calendar per machine, finish dates that skip weekends and holidays, late jobs in red.
Read moreMold Tracking Template for Excel (Free)
Free mold tracking template for Excel. Log finished jobs and get shot counts from cavities, shots left until maintenance and a status for every mold.
Read moreInjection Molding Production Log: Free Excel Template
Free injection molding production log for Excel. Shots, cavities, average cycle time, performance, scrap rate and uncounted parts, worked out per shift.
Read morePreventive Maintenance Schedule Template for Excel (Free)
Free preventive maintenance schedule template for Excel. A maintenance plan per machine, intervals in days or run hours, next due dates, overdue flags and a maintenance log.
Read moreQuality Control Checklist Template for Excel (Free Inspection Form)
Free quality control checklist template for Excel. An inspection form with nominal, tolerances and up to five readings per characteristic, OK / NOK by formula and a summary.
Read moreFirst Article Inspection Form Template for Excel (Free)
Free first article inspection form for Excel. Check the first part after a setup against its tolerances, get OK / NOK by formula, record the decision and sign-offs.
Read moreShift Handover Template for Excel (Free, Printable)
Free shift handover template for manufacturing. Machine status, running job, target and good quantity, scrap, downtime, open issues, safety notes and sign-offs on one page.
Read more