Shift handover template for Excel (free)
A shift handover sheet puts everything the outgoing shift needs to pass on onto one page. Machine status, the job on each machine, output for the shift, downtime, open issues and safety notes. This free Excel template has a printable handover form and a list that keeps track of issues that stay open from one shift to the next.
Last updated: 8 November 2026
Who is it for?
Shops that run more than one shift and hand over by word of mouth or with a few lines in a notebook. What gets lost in a spoken handover is usually small but expensive. A first article waiting for approval, a hydraulic pressure to keep an eye on, or material nobody remembered to ask the stores for.
Preview and download
The top of the form holds the date, area, the outgoing and incoming shift and both shift leads. Then comes one row per machine:
| Machine | Status | Work order | Target | Good | Vs target | Downtime (min) | Note for the next shift |
|---|---|---|---|---|---|---|---|
| CNC-01 | Running | WO-1042 | 120 | 115 | 95.8% | 45 | The last 5 pieces finish on the evening shift |
| CNC-02 | Running | WO-1043 | 80 | 78 | 97.5% | 30 | |
| Lathe-01 | No work | Material for WO-1045 arrives tomorrow morning | |||||
| Mill-01 | In setup | WO-1039 | 60 | 50 | 83.3% | 25 | New tool fitted, waiting for first-article approval |
| Weld-01 | In maintenance | 90 | Ready at 18:00 |
Vs target is the good quantity divided by the target. The total row gives the whole shift, 93.5% in this example. Below the machine table are sections for open issues, safety and housekeeping, missing material and tools, and sign-off boxes for both leads.
Excel (.xlsx), four sheets: printable handover form (A4 landscape), open issues list, lists of machines, shifts and states, and a detailed how-to. No email needed.
Download the templateWhat to cover in a shift handover
| Topic | Why it matters |
|---|---|
| Machine status | The incoming shift should know in the first minute which machines run and which are down or in maintenance. |
| Running job and pieces left | So the job carries on where it stopped and nobody sets it up twice. |
| Downtime in the shift | A breakdown or material problem that keeps coming back will carry on into the next shift. |
| Open issues | A part waiting for approval, material on its way, a machine coming back from maintenance. An issue without an owner and a priority gets forgotten. |
| Safety and housekeeping | A locked-out machine, oil on the floor, a missing guard. The first things the incoming shift needs to know. |
| Missing material and tools | A shortage found on the night shift, with the stores closed, can stop a machine for hours. |
Do the handover at the machines, with both leads together. A handover done on paper in the office misses the oil next to a machine or a setup left half done.
How to use it
- Put your machines and shifts on the Lists sheet.
- The outgoing lead fills in the form before the shift ends. Pick each machine's status from the list and enter the work order, target and good quantity, scrap and total downtime in the shift. Vs target and the totals are worked out for you.
- Use the note column for what the next shift needs to know, and fill in the open issues, safety and missing material sections.
- Both leads walk the machines together, sign the form and write down the time.
- Move issues not closed within the shift to the Open issues sheet. Anything open for more than three days shows red. Copy the Shift handover sheet for each new shift.
When a spreadsheet stops being enough
The counts and downtime on the form are usually written from memory at the end of the shift. Most of the handover then goes on adding up those numbers, and little time is left for the open issues.
ModernMES has no separate handover screen, but most of what goes into the machine table is already in the system. The live workshop view shows each machine's status, the open job on it and the operator, and can stay open full screen on a display in the shop. When an operator pauses a job, the stop is recorded with its reason, and a machine that has been stopped for 5 minutes raises an alert in the panel. Users who opt in get a summary of the previous day's output, scrap and downtime by email each morning. At the handover you can open that view and talk through the machines, and keep using the form for open issues and safety notes. See production tracking software.
Frequently asked questions
What should a shift handover report include?
Each machine's status, the job on it and the pieces left, downtime in the shift, open issues, safety notes and missing material. Both the outgoing and incoming leads sign it and write down the time.
How long should a shift handover take?
Ten to fifteen minutes is enough for most shops. If the form is filled in beforehand, the time goes on the open issues rather than the numbers. A short overlap between shifts makes the handover easier.
Who signs the shift handover?
The leads of the outgoing and incoming shift. The signature shows the information was passed on and the incoming lead has taken over. It saves arguing later about who knew what when something goes wrong.
How do I track shift output in more detail?
This form is a summary of the shift. For hours and quantities per job use the production tracking spreadsheet, and to log each stop with its reason use the downtime tracking template.
Related pages
- Downtime Tracking Template for Excel (Free)Free machine downtime tracking template. Log when a machine stopped and why, and get minutes, groups and a Pareto by reason from the built-in formulas.
- Production Tracking Spreadsheet: Free Excel TemplateFree production tracking spreadsheet for Excel. Log machine, operator, work order, time, good and scrap counts. Scrap rate and machine totals are built in.
- Preventive Maintenance Schedule Template for Excel (Free)Free preventive maintenance schedule template for Excel. A maintenance plan per machine, intervals in days or run hours, next due dates, overdue flags and a maintenance log.
- Machine Downtime Tracking: Downtime Reasons and AnalysisHow to track machine downtime: a short list of downtime reasons, paper vs Excel vs software, Pareto analysis, MTTR and MTBF, and common mistakes.