Downtime tracking template for Excel (free)

A downtime log records when a machine stopped, when it restarted and why. In this free Excel template the minutes, the reason group and whether the stop counts as a loss fill in on their own, and the Analysis sheet ranks the reasons that cost the most time.

Last updated: 8 November 2026

Who is it for?

Shops that do not record stops at all, or write them from memory at the end of the shift. Once stops are logged, most of the lost time usually turns out to come from a handful of reasons. This template is the cheapest way to find them.

Preview and download

The sample rows look like this. Minutes, group and loss are formulas, and the reason comes from a list.

DateMachineStoppedRestartedMinReasonGroupLoss?
2026-10-27CNC-0109:1009:5545Setup / changeoverSetupYes
2026-10-27CNC-0210:2010:5030Waiting for materialUnplannedYes
2026-10-27Mill-0112:0012:3030BreakPlannedNo
2026-10-27Mill-0113:4014:0525Tool breakage / changeUnplannedYes
2026-10-27CNC-0117:3018:4070Machine breakdownUnplannedYes
2026-10-28Lathe-0108:0008:2020First-article approvalSetupYes

Excel (.xlsx), five sheets: downtime log, analysis by reason with a chart, 12 ready reasons, machine list and a detailed how-to. No email needed.

Download the template

Above are the first six rows of the file. The file has 15 stops over three days, up to 2026-10-29, and on the Analysis sheet they add up to 625 minutes. Machine breakdown comes first with 160 minutes (25.6%), waiting for material second with 125 minutes (20.0%) and setup third with 110 minutes (17.6%). Breaks, shift changes and preventive maintenance are in the total too, but they do not count as a loss.

Downtime reasons and groups

The file comes with 12 reasons in four groups. Change the list to fit your shop. 8 to 15 reasons are enough, and we suggest leaving out "Other", because when it is there most stops end up in it.

GroupReasonsCounted as loss?
PlannedBreak, shift change, no work scheduledNo
SetupSetup / changeover, first-article approvalYes
UnplannedMachine breakdown, tool breakage, waiting for material, no operator, quality problem, power outageYes
MaintenancePreventive maintenanceNo

Why the groups are drawn this way, and why setup counts as a loss, is in the machine downtime tracking guide.

How to use it

  1. Edit the reasons on the Reasons sheet in your shop's own words, with a group and a loss flag for each.
  2. Put your machines and shifts on the Lists sheet.
  3. When a machine stops, note the time. When it restarts, note that time and pick the reason. Minutes and group follow.
  4. Keep the sheet next to the machine. A stop logged while it happens is far more accurate than one remembered at the end of the day.
  5. Look at the Analysis sheet once a week. Rank 1 is the reason that cost the most time. Start there.

When a spreadsheet stops being enough

The limit of paper and spreadsheets is that the stop is written down after it happened. Short stops are forgotten, long ones get rounded, and a manager hears about a stop the next day.

In ModernMES, pausing a job on the terminal or a phone opens the stop and asks for the reason, with the time already recorded. Connect the machine's own signal and stops are caught even when nobody presses anything. If a machine has been stopped for 5 minutes, or a stop has had no reason for 10 minutes, an alert appears in the panel. You set the reasons and their groups yourself. See production tracking software.

Frequently asked questions

What should a downtime log record?

Four things: which machine stopped, when it stopped, when it restarted and why. The first three give the duration, the last gives the reason. Without either one the record is of little use.

Do breaks and maintenance count as downtime?

Log them, but do not count them as losses. Breaks come off planned time, and preventive maintenance is time set aside to prevent breakdowns. In the file their Loss? column says No.

How do I make a downtime Pareto chart?

Add up minutes per reason, sort largest first and note each reason's share of the total. The Analysis sheet gives the totals, shares and rank, with a chart. For the Pareto order, select only the rows that have a reason and sort them by Minutes, largest first, leaving the empty rows and the Total row out.

How does downtime affect OEE?

The availability part of OEE is planned time minus downtime, divided by planned time. 45 minutes of downtime in a 450-minute shift brings availability down to 90%. Work it out with the OEE Excel template.