Production tracking software for machining companies
In a machining company the same part goes through turning, milling, grinding and inspection, the same order comes back a few weeks later, and the customer asks which material every batch was made from. ModernMES records each operation on the shop floor as it happens, so you can see where every job is, how long the part really took and which heat it was made from.
Last updated: 1 November 2026
Why tracking gets hard in machining
- A part goes through four or five operations, each waiting in a different machine's queue. Nobody notices a batch sitting in front of a machine.
- On a repeat order, nobody knows last time's time or cost, because last time's actual time was never written down.
- When a customer complaint asks for the material certificate and heat number, someone goes through binders to find it.
- First-article approval and dimensional checks stay on paper, scrap reasons go unrecorded and the same defect shows up in the next batch.
- Manual machines and new CNCs work side by side, and not every machine can send data.
From routing to work order
In ModernMES a customer order becomes a project. When a routing is applied to a part, each step becomes its own work order in the queue of its machine group. You can enter parts and routings in the web app or, if you have a list, import it from an Excel template. A saved routing is reused when a part comes back.
- You print the route card, with a Code128 barcode or QR code for every operation. The card travels with the batch.
- The operator signs in with a badge on the terminal next to the machine or on their phone, then scans the code on the route card to start the operation.
- When pausing, they pick a reason. Setup, first-part approval, tool breakage and waiting for material come ready, and you add your own.
- When finishing, they enter good and scrap counts and the batch moves to the next operation's queue.
The terminal runs in a browser. Nothing has to be connected to the machine, so a manual lathe is tracked the same way as a new machining center.
Material certificates and lot traceability
Incoming material is recorded as a material lot, with the supplier's heat number and certificate details on it. The batch you produce is a production lot, and how much it consumed from which material lot is entered in the panel by an admin or manager. The operator terminal has no traceability screen.
When a complaint comes in, you go back from the part to the heat and its certificate, or forward from a heat to every batch it went into. How to set it up is covered in the lot traceability guide.
Inspection and scrap
First-article, in-process and final inspection results are recorded against the work order. Scrap is logged with its defect type and, when needed, a note and photos. Types such as out of tolerance, burr, surface defect and hole or thread defect come ready, and you can add your own. The quality report ranks defects by type, so you see which one causes the most scrap.
Real time and cost per part
Because every operation's start and finish are recorded, actual times build up on their own. ModernMES recalculates the typical time of each operation every night from past jobs. Once machines have an hourly cost, the plan vs actual tab of the production status report shows planned and actual hours and cost side by side by part, operation, project or machine.
When the part comes back, the quote is built from the same records. Times come from the last 36 months of actual times for that part, its family or the machine group, and hourly rates from the machines. There is more in job shop quoting.
Capacity and due dates
The panel compares each machine group's open workload with its capacity. The workload tab of the production status report shows how many days of backlog each machine has and when the queue will clear, and the deadline check on the project page says whether the due date fits the capacity. That check assumes work can spread freely across a group's machines. To place jobs on machines hour by hour, the Professional and Enterprise plans have a Production plan screen, where jobs line up on each machine's row within working hours and a part's steps are planned in order.
The live shop floor screen shows which job is running on which machine, and you can open separate TV boards for groups such as turning, milling and grinding.
Getting started
You can try ModernMES free for 14 days without a credit card. For companies that do not want data to leave the site, it can also be installed on your own server. If you run one-offs and short runs, the CNC machine shop page may fit you better. You can see the system first in the live shop floor demo.
Frequently asked questions
Do machines need sensors for production tracking?
No. The main data comes from the start, pause and finish records operators enter on a terminal or phone, so it works on manual machines too. If you want, the running and stopped state can also come from ModernMES Connector on a computer in the factory, a PLC gateway or a sensor box over HTTP or MQTT.
Can it keep material certificates and heat numbers?
Yes. Incoming material is recorded as a material lot with the supplier's heat number and certificate details. Which material lots a production lot consumed is entered in the panel, and you can trace from a part to its material or from a material to its parts.
Can I see last time's time on a repeat order?
Yes. The actual time of every operation is recorded and the typical time is recalculated every night from past jobs. Quotes use the last 36 months of actual times for the same part.
Does it do scheduling?
ModernMES compares workload with capacity by machine group and tells you whether a due date will hold. The Professional and Enterprise plans also have a Production plan screen. You drag jobs onto machines, or Place automatically lines them up within working hours, nearest deadline first.
Related pages
- Real-Time Production Tracking for CNC Machine ShopsReal-time job tracking for CNC machines: operator terminals, a live view of which job runs on which machine, downtime reasons, real cycle times. Free for 14 days.
- Lot Traceability Software for Batch ManufacturingBatch traceability in manufacturing: heat numbers, certificates, two-way genealogy for recalls, and a QR product passport with energy estimates.
- Job Shop Quoting: How to Quote a Machining JobHow to quote machining jobs: setup and run time, machine hourly rates, material, outside processing and markup, with a worked example and common mistakes.
- OEE Calculator: Calculate OEE With a Worked ExampleFree OEE calculator. Enter planned time, downtime, ideal cycle time and counts and get OEE as you type, with a worked example, the formula and common mistakes.