In the cloud or on your own servers

Shop floor tracking, without the paperwork

ModernMES is a manufacturing execution system (MES) for job shops, mould makers and small to mid-sized factories. Plan work orders and projects, let operators start and finish jobs on a shop-floor terminal, and follow machine status and project progress live.

14-day free trial · No credit card · Nothing to install

app.modernmes.com/dashboard

OEE

87.5%

Production

1,247

Efficiency

94.2%

Production Trend

Work Orders
Machines
Reports
Features

Everything you need to run the shop floor

Know where every job is, who is working on it and how long it really takes — from order to shipment.

Work order and project tracking

Break projects into parts and parts into routing steps. The status, estimated and actual time of every step and the project's completion percentage on one screen.

Operator terminal

Operators sign in with their badge number, see the next jobs queued for their machine and start, pause or finish them. Runs in the browser on a tablet or a shop-floor PC.

Live shop floor view

See which machines are running, which are idle and who is working on what, live. Put it on the TV on the shop floor too.

Routings and Excel import

Bring your part list and operation routings in from the spreadsheet you already keep. Apply a saved routing to a new project in one click.

OEE and reports

Overall Equipment Effectiveness from availability, performance and quality. Time and efficiency reports per machine, operator and project.

Quality and scrap

Keep inspection results and scrap records on the work order itself. See defect causes in a Pareto chart.

Maintenance

Record planned and breakdown maintenance per machine and keep track of the maintenance calendar and downtime.

ERP integration

Send production and scrap records to Logo, Mikro, Netsis, DIA, Paraşüt, SAP Business One, SAP S/4HANA, Microsoft Dynamics 365 Business Central or Odoo, and pull stock and customer records back.

Several workshops

Run several workshops, resource groups and shifts in one account and follow each of them on its own.

How it works

From paper to screen in four steps

No server to set up and no code to write. Open an account in the browser and start with the data you already have.

  1. 1

    Import parts and routings

    Upload your part list and operation sequences with the Excel template, then add your machines and operators.

  2. 2

    Open a project

    Open the customer order as a project, add its parts and apply the saved routing. The work orders are created for you.

  3. 3

    Operators work from the terminal

    The terminal at each machine lists the jobs queued for it. Operators start, pause and finish them; the times are recorded on their own.

  4. 4

    Follow progress live

    Project completion, late jobs and machine status show up on the dashboard and the live shop floor view as they happen.

Pricing

Choose the Right Plan for Your Business

Pick by the number of machines and users. Every plan comes with a 14-day free trial.

MonthlyYearlySave 20%

Starter

For small shops: up to 5 machines and 3 users.

799TRY/mo

Billed yearly: 9,588 TRY

  • Up to 5 machines
  • 3 users
  • Unlimited work orders
  • Every MES feature: work orders, OEE, quality, maintenance, reports
  • Operator terminal and live shop floor view
  • Email support
Try free for 14 days
Most Popular

Professional

For growing shops: up to 25 machines and 15 users.

1,999TRY/mo

Billed yearly: 23,988 TRY

  • Up to 25 machines
  • 15 users
  • Unlimited work orders
  • Every MES feature: work orders, OEE, quality, maintenance, reports
  • Operator terminal and live shop floor view
  • Priority support
Try free for 14 days

Enterprise

For larger plants: unlimited machines and users, ERP integration included.

3,999TRY/mo

Billed yearly: 47,988 TRY

  • Unlimited machines
  • Unlimited users
  • Unlimited work orders
  • Every MES feature: work orders, OEE, quality, maintenance, reports
  • Operator terminal and live shop floor view
  • Priority support and onboarding help
  • ERP integration included
Talk to Sales

Add-on modules

ERP integration

Sends production and scrap records to your ERP or accounting software and pulls stock and customer records from it.

799 TRY/mo · included in Enterprise

Prices exclude VAT. Prices are in Turkish lira (TRY). Need an invoice in USD, EUR or GBP? Write to us. info@modernyazilim.com

On-Premise

Your data, on your own servers

Run ModernMES in your own data center instead of the cloud. One-command install, with a license bound to your server.

On your hardware

The whole system — application, database, reporting — runs on your own hardware; an internet outage never stops production.

Data never leaves

Your production data stays inside your facility. Offline licensing is available for air-gapped networks.

Hardware-bound license

Your license key is cryptographically signed to your server's hardware identity; the installation cannot be copied elsewhere.

Version updates

New releases arrive as signed packages; update with a single command, without data loss.

Request a quote

Pricing is per project, based on user count and facility size.

FAQ

Frequently asked questions

Answers to the most frequently asked questions about ModernMES

What is an MES?

An MES (manufacturing execution system) is software that tracks production from the moment an order becomes work on the shop floor until it is finished: which job is on which machine, who is working on it, how long it took and how much was scrapped. An ERP holds what to make and what it costs; an MES shows how production is actually going.

Who is ModernMES for?

It is built for job shops that work to order or by project — CNC machining, mould and die making, machine building and assembly — and for small to mid-sized factories with anywhere from 5 to a few hundred machines. It is written to replace the paper travellers, spreadsheets and whiteboards such shops usually run on.

How much does ModernMES cost?

ModernMES is sold as a subscription: Starter is 999 TRY a month (up to 5 machines, 3 users); Professional is 2,499 TRY a month (up to 25 machines, 15 users); Enterprise is 4,999 TRY a month (unlimited machines, unlimited users). Prices exclude VAT, and paying yearly saves 20%. The pricing section on this page always shows the current prices.

Is there a free trial?

Yes. Every plan starts with a 14-day free trial and signing up needs no credit card. You can use every feature with your own data during the trial.

Which ERP and accounting systems does it integrate with?

The ERP integration add-on works with Logo, Mikro, Netsis, DIA, Paraşüt, SAP Business One, SAP S/4HANA, Microsoft Dynamics 365 Business Central and Odoo, and there is a generic JSON/REST connection for other systems. Production and scrap records go to the ERP; stock and customer records come from it. It is included in Enterprise and can be added to the other plans.

Can we run it on our own servers?

Yes. ModernMES runs in the cloud or in your own data center (on-premise). Installation is a single command, the license is bound to your server's hardware, and offline licensing is available for air-gapped networks.

How do operators use it?

From the operator terminal left open on a tablet or PC next to the machine. Operators sign in with their badge number, see the jobs queued for that machine and start, pause or finish them. There is nothing to install; the terminal runs in the browser.

Can we import our existing parts and routings?

Yes. Upload parts and operation routings in bulk with the Excel template. Before anything is imported, the system checks the file and shows what will be added and which rows have problems.

Is my data secure?

Each company's data is kept apart from every other company's at the database level, and every connection is encrypted with HTTPS. For companies that do not want their data to leave the site, ModernMES can be installed on their own servers.

Can I change my plan later?

Yes, you can upgrade or downgrade at any time. The change takes effect from the next billing period.

Ready to Get Started?

Move your shop floor off paper this week

Try it free for 14 days, no credit card required. Questions? Write to us.

No credit card required - 14 day free trial