Job tracking software for stone fabrication and masonry workshops
In a workshop that cuts marble, granite, limestone or quartz, every order is its own project. A worktop, a staircase, a cladding package or a carved window surround all come with their own sizes and pass through several stations from saw to polish. ModernMES shows which station every piece is at, how long the work took and whether the delivery date will hold.
Last updated: 19 November 2026
The short answer
ModernMES is cloud production tracking software that keeps a stone order as a project, its pieces as project parts and steps such as sawing and polishing as work orders. Masons start and finish jobs on a shared tablet in the workshop and can open the 3D model of the piece on the same screen. Quantities can be counted in square metres. Nothing has to be connected to the machines. The trial is free for 14 days and needs no credit card.
Why jobs get lost in a stone workshop
A kitchen worktop is five or six pieces. A facade or a restoration job can be several hundred. Pieces go from the bridge saw to the CNC, on to edge profiling, polishing and hand finishing, each in its own order. Three or four projects are in the workshop at once, and their pieces queue at the same machines.
- Which pieces are cut, and which are still in the slab?
- How many hours of work are waiting at the polishing line this week?
- Will every piece be ready for the day promised to the fitting team?
- How many hours did that staircase really take, and was the price right?
In most workshops the answers come from a whiteboard, job sheets and the memory of the foreman. As the number of projects grows, delivery dates are the first thing to slip.
Each order is a project, each stone is a part
You open the order as a project. Every stone is a line in the project and carries its own steps, such as bridge saw, waterjet, CNC machining, edge profile, polishing, hand finishing and packing. You can pick the steps for each piece by hand, or use a saved routing for work you do often. If your cutting list is in a spreadsheet, you can import it in one go.
Each step lands as a work order in the queue of its resource group. The project screen shows which step every piece is at and how much of the project is complete. If the job starts with a quote, a won quote becomes a project in one click. The details are on the make-to-order page.
Counting in square metres
In the short setup questions you can choose stone, glass and sheet as your trade and square metres as the unit you count in. An order line then takes width, length and count, and the square metres are worked out for you. Operators enter the finished quantity in the same unit. If you count piece by piece, choose pieces and the screens follow.
The sample workshop you can load during the trial is prepared for stone as well. It comes with stations such as a bridge saw and a polishing line, so you can see the flow before entering your own machines.
Masons open the 3D model of the piece on the tablet
In bespoke and carved work, what the mason needs most is to see the piece itself. You upload the 3D model to the part. When a job for that part is selected at the shop floor terminal, an "Open 3D model" button appears. The mason can rotate the model, cut a section through it and measure between two points. There is nothing to install, the model opens in the browser.
- STEP, IGES, STL, OBJ, GLB, 3MF and PLY files are supported. Exporting to one of them from your drawing software is enough.
- A part can have several models, and the mason can switch between them.
- If you want, you can build step-by-step work instructions on the model. Each step is a saved view of the model with a title and a note.
- Drawings and photos can be attached to the part and the project as PDFs or images.
Recording work on a shared tablet
One tablet in the workshop is enough. You can add the terminal to the home screen of the tablet and open it full screen like an app. The mason picks their name or scans their badge, finds the job and starts it. They choose a reason when they pause and enter the quantity when they finish. Times are recorded automatically.
Stone machines are often not connected to anything, and that is not a problem. The records come from masons starting and finishing jobs. The live shop floor view shows which project is on which machine.
Delivery and fitting dates
The deadline feasibility card on every project compares the project's remaining work with the capacity of each resource group up to the delivery date, after the other work already waiting there. The result is shown as fits, tight or over capacity, with the bottleneck group, for example the polishing line, named beside it.
You can send the customer or the site an order status link. They see whether the order is in production or ready to ship and how much of each item is finished. Prices, costs, machines and the names of your people are not on that page. For jobs delivered in parts, the Shipments screen keeps the ordered, made, shipped and remaining quantities.
What it does not do
ModernMES is not CAD/CAM or slab nesting software. It does not produce cutting layouts or send programs to a machine, and it does not do accounting or invoicing. Its job starts once the design is finished: which piece is where, who is working on it, how long it took and whether the date will hold. You can look around the live shop floor demo or compare plans in the pricing guide.
Frequently asked questions
Is it too much for a small stone workshop?
It suits workshops with one or two machines and a handful of masons. Modules you will not use leave the menu during setup. You can enter your projects and machines and start recording work on a tablet the same day.
How does a mason see the 3D model?
They select their job at the terminal and press "Open 3D model". They can rotate the model, cut a section and take measurements. You upload the model to the part once.
Which 3D files can be opened?
STEP, IGES, STL, OBJ, GLB, 3MF and PLY. If your drawing software can export to one of these, the model opens at the terminal.
Does it track slab stock and offcuts?
The Stock module on the Professional and Enterprise plans adds materials and a bill of materials. It does not do slab nesting or offcut optimisation.
Our machines are old. Do they need to be connected?
No. The records come from masons starting and finishing jobs on the tablet. If you want, the running or stopped state of a machine can be brought in automatically later.
Related pages
- Job Tracking for Make-to-Order and Custom Fabrication ShopsFor stone, glass, joinery and steel shops that make to order: quote to project, quantities in square metres, shop floor recording on a tablet, delivery date checks and a status link for the customer.
- Job Shop Quoting: How to Quote a Machining JobHow to quote machining jobs: setup and run time, machine hourly rates, material, outside processing and markup, with a worked example and common mistakes.
- Production Tracking Software for Small ManufacturersProduction tracking software for job shops: track the workflow from work order to shipment, see which job is on which machine, good and scrap counts and why it stopped.
- Production Tracking vs Spreadsheets: Moving From Excel to an MESProduction tracking software vs spreadsheets: where Excel breaks down, a side-by-side comparison, which lists to prepare and how to move to an MES without stopping work.
- MES Software Pricing 2026: Average Cost per Machine, User and SetupWhat does MES software cost on average? Published prices run €190 to €320 per machine a month for shop floor monitoring and $49 to $149 per user for cloud MRP. Setup, hidden costs, discounts and ModernMES prices.