Job tracking for make-to-order and custom fabrication shops

In a shop that makes stone worktops, glass, joinery, furniture or steelwork to order, no two jobs are the same. Each order comes with its own sizes, its own material and its own delivery date. ModernMES keeps the order in one place from quote to delivery and shows which stage every piece is at.

Last updated: 19 November 2026

Why make-to-order work is hard to track

In series production the same part runs for months, and a routine set up once keeps working. In make-to-order work there is a new job list every week. Sizes come from the customer, some are measured on site, and the job passes through cutting, machining, finishing and preparation for fitting. The owner hears the same questions all day:

  • Which pieces of this order are finished, and which are still waiting at a machine?
  • Will we make the delivery date we promised?
  • When the customer rings to ask how their job is going, who looks where to answer?
  • How many hours did this job really take, and was the quote right?

When the answers sit in a spreadsheet, on job sheets and in the heads of the foremen, every question means a walk around the shop. As the number of jobs grows, delivery dates are the first thing to slip.

From quote to project

Most jobs start with a quote. On the Quotes screen in ModernMES each part is a line. The time of its steps comes from your own past jobs and the hourly rate from your machines. You can quote a company that is not a customer yet. You print the quote and send it yourself. How the figures are worked out is explained in the job shop quoting guide.

A won quote becomes a project in one click. Each line becomes a project part with the ordered quantity, and each step lands as a work order in the queue of its resource group. A job that arrives without a quote is opened as a project directly. If your parts list is ready, you can bring it in with an Excel template.

If you count in square metres, not pieces

In stone, glass and sheet work the quantity is usually square metres, not pieces. Profiles and joinery are often counted in metres, and some work in kilograms or litres. Six short questions during setup ask what you make and what you count production in, and the panel is set up to match.

  • If you chose square metres, an order line takes width, length and count, and the square metres are worked out for you. With metres, length and count are enough.
  • Operators enter the quantity in the same unit, with decimals, when they finish a job.
  • Modules you will not use leave the menu. No records are deleted, and you can switch a module back on in Settings.
  • The sample shop floor you can load for a trial matches your trade. A stone shop gets bridge saws and polishing lines, a wood shop gets panel saws and an edge bander.

Recording work on a tablet or a phone

The job card printed for a project has a barcode or QR code for every step of every part. On a shared tablet in the workshop, or on their own phone paired with a QR code, the operator scans their badge, scans the step and starts the job. They pick a reason when they pause, and enter good and scrap quantities when they finish. Times are recorded automatically, and nothing has to be connected to the machines.

You can attach the drawing or a photo to a part as a PDF or an image. If you upload its 3D model, the operator can open it at the terminal for the selected job, rotate it and take measurements. The stone fabrication page shows how this works in a stone workshop. The project screen shows which step every part is at and how much of the project is complete. The live shop floor view shows which order is on which machine.

Will the delivery date hold?

Every project has a deadline feasibility card. It compares the project's remaining work with the working capacity of each resource group up to the delivery date, after the other open work already waiting there. The result is shown as fits, tight or over capacity, with the bottleneck group and the earliest finish date the current load allows.

This is not a detailed scheduler. It does not model setup order, breaks within a shift or who is in the workshop that day. What it gives you is a warning that a delivery date is at risk, weeks before it is missed.

You can switch on an order status link for a project and send it to your customer. On that page the customer sees whether the order is received, in production or ready to ship, how much of each item has been produced, and the deliveries made so far. Prices, costs, machines and the names of your people are not on it. You can switch the link off or renew it at any time.

If a job is delivered in parts, the Shipments screen lists the project's parts with the ordered, made, shipped and remaining quantities. A delivery note is printed for each delivery.

Actual hours and the next quote

When a job is done, the actual time of every step is on record next to its estimate. The next time you quote similar work, the times come from those records, so quotes get sharper the longer the system is used. You can look around the live shop floor demo or compare plans in the pricing guide. The 14-day free trial needs no credit card.

Frequently asked questions

Does it work for one-off jobs that never repeat?

Yes. You add the part inside the project and choose its steps by hand or from a saved routing. For repeat work a part can have a default routing, so the same job is not set up from scratch again.

Our machines are old and not connected to anything. Is that a problem?

No. The records come from operators starting and finishing jobs on a tablet or phone, so nothing has to be connected to a machine. If you want, the running or stopped state of a machine can be brought in automatically later.

Our operators do not use computers. Will they manage?

An operator only scans their badge and the code on the job card, then presses start and finish. A user with the shop floor role sees the shop floor screen only. The rest of the panel, including prices, is not open to them.

Does it do accounting, purchasing or invoicing?

No. ModernMES is not an ERP or an accounting package. It covers quotes, projects, work orders, shop floor recording, quality and deliveries. The Stock module on the Professional and Enterprise plans adds materials and a bill of materials. Invoicing and accounts stay in the software you already use.

Which languages is it available in?

The interface is available in English, Turkish, German, Hungarian and Italian, and each user picks their own language.