Production tracking software for joinery and furniture workshops
In a workshop that makes fitted kitchens, wardrobes, doors or office furniture to order, every job breaks down into dozens of panels. They go to the panel saw, the edge bander, the drilling centre, the spray shop and assembly separately. ModernMES shows which piece of which order is at which station, and whether the job will be ready for fitting day.
Last updated: 19 November 2026
The short answer
ModernMES is cloud production tracking software that keeps a joinery or furniture order as a project, its panels and components as project parts, and steps such as cutting and finishing as work orders. Operators start and finish jobs on a shared tablet in the workshop. Quantities can be counted in pieces, metres or square metres. Nothing has to be connected to the machines. The trial is free for 14 days.
The panel that is missing on fitting day
In furniture work, the usual cause of a late job is one missing piece. Thirty-nine of the forty panels of a kitchen are ready, the lacquered door is still in the spray shop, and the fitters wait. Most workshops find out on the morning of the fit.
- Which panels of this order are edged, and which are still in finishing?
- How many hours of work are queued at the spray shop this week?
- Will every piece be ready for the fitting date we promised?
- How many hours did that kitchen really take?
Each order is a project, each panel is a part
You open the order as a project. Every panel or joinery component is a line in the project and carries its own steps, such as panel saw, edge banding, drilling and routing, finishing and assembly. For work you do often you use a saved routing. If your cutting list is in a spreadsheet, you can import it in one go.
The project screen shows which step every piece is at and how much of the order is complete. You see the missing door the day it joins the finishing queue, not the day before the fit.
Pieces, metres or square metres
In the short setup questions you choose wood and furniture as your trade, and pieces, metres or square metres as the unit you count in. With metres, an order line takes length and count and the total is worked out for you. With square metres it takes width, length and count.
The sample workshop you can load during the trial is a furniture shop, with panel saws, a CNC drilling and routing centre, an edge bander and finishing lines. You can see the flow before entering your own machines.
Recording work, and drawings at the bench
One tablet in the workshop is enough. You can add the terminal to the home screen of the tablet and open it full screen like an app. The operator picks their name or scans their badge and starts the job. They choose a reason when they pause and enter the quantity when they finish. Times are recorded automatically.
You can attach the drawing to a part as a PDF or an image. If you upload the 3D model of a bespoke piece (STEP, IGES, STL, OBJ, GLB, 3MF or PLY), the operator can open it at the terminal for the selected job, rotate it and take measurements.
Fitting dates and the customer
The deadline feasibility card on every project compares the remaining work with the capacity of each resource group up to the delivery date. The result is shown as fits, tight or over capacity, with the bottleneck group named beside it. In most workshops that is the spray shop.
You can send the customer an order status link. It shows the stage the order is at, without prices or the names of your people. To be clear about what it does not do: ModernMES does not optimise panel cutting or produce cutting layouts, and it does not do accounting or invoicing. You can look around the live shop floor demo or compare plans in the pricing guide.
Frequently asked questions
Does it work when every order is different?
Yes. You add the pieces inside the project and choose their steps by hand or from a saved routing. The make-to-order page explains this in more detail.
Does it do cutting optimisation?
No. You take the cutting list from your optimisation software and import it from a spreadsheet. ModernMES follows the pieces through the workshop after they are cut.
Our operators do not use computers. Will they manage?
An operator picks their name on the tablet and presses start and finish. A user with the shop floor role sees the shop floor screen only.
Does it keep stock and materials?
The Stock module on the Professional and Enterprise plans adds materials and a bill of materials. Accounting and purchasing stay in the software you already use.
Related pages
- Job Tracking for Make-to-Order and Custom Fabrication ShopsFor stone, glass, joinery and steel shops that make to order: quote to project, quantities in square metres, shop floor recording on a tablet, delivery date checks and a status link for the customer.
- Job Tracking Software for Stone Fabrication and Masonry WorkshopsTrack every stone order piece by piece: square metre quantities, shop floor recording on a shared tablet, 3D models of bespoke pieces for the mason, delivery date checks.
- Job Shop Quoting: How to Quote a Machining JobHow to quote machining jobs: setup and run time, machine hourly rates, material, outside processing and markup, with a worked example and common mistakes.
- Production Tracking vs Spreadsheets: Moving From Excel to an MESProduction tracking software vs spreadsheets: where Excel breaks down, a side-by-side comparison, which lists to prepare and how to move to an MES without stopping work.
- MES Software Pricing 2026: Average Cost per Machine, User and SetupWhat does MES software cost on average? Published prices run €190 to €320 per machine a month for shop floor monitoring and $49 to $149 per user for cloud MRP. Setup, hidden costs, discounts and ModernMES prices.