Country and material averages for the carbon estimate
If you don’t know an emission factor, Traceability → Lot and emission settings now lets you pick from published averages.
- Grid electricity: the Pick from country averages link under the factor field lists the averages of 30 countries, the EU and the world. For Turkey it also lists the Ministry of Energy’s 2023 factors (site on the distribution grid, site on the transmission grid, national average). Use writes the value and its source into the form; press Save to apply it.
- Materials: the Average values button shows per-kg figures published by producers’ associations for steel, stainless steel, aluminium, copper and zinc. The value you pick goes into the add form; you enter the material code.
- The figures are approximate; if your supplier or electricity contract states a figure, use that. The source of the value you pick is shown next to it everywhere.
- Also: dialogs with long content (such as a machine signal source key) no longer run off the screen, and the key is shown in full.