Production tracking for mold and die shops
A mold is a core, cavities, plates and dozens of smaller parts that pass through CNC milling, EDM, wire EDM, grinding and bench work before they meet at assembly. ModernMES tracks each mold as a project and shows where every part is waiting.
Last updated: 20 October 2026
Why mold shop deadlines slip
Mold making is project work. Every tool is different, parts take different paths through different machines, and assembly can only start when the last part arrives. When tracking lives on a whiteboard or in a spreadsheet, the trouble usually looks like this:
- At assembly, someone discovers a slide is still waiting in the EDM queue.
- Three molds need the same wire EDM machine and the order is settled by phone calls.
- Parts recut after a design change never get recorded, so time and cost look lower than they were.
- The next mold is quoted without knowing how many hours the last one really took.
Each mold is a project
ModernMES has no separate "mold" record. A mold is opened as a project with its customer, due date and budget. The project's parts are the mold's parts: A and B plates, core, cavity inserts, ejector plate, slides. Each part gets a routing made of the operations you define.
| Part | Example routing |
|---|---|
| Core insert | CNC roughing → heat treatment (outside) → CNC finishing → sinker EDM → polishing |
| Slide | CNC milling → wire EDM → grinding → bench work |
| Mold plates | Saw → CNC milling → drilling → grinding |
| Assembly | Fitting and assembly → tryout → corrections |
Projects can be split into phases such as design, manufacturing and tryout. Operation names and order are entirely yours, and sinker EDM, wire EDM or polishing can each be tracked as their own resource group.
On the floor: route card, barcode, terminal
A route card is printed for each mold, with a barcode or QR code for every step of every part. At the machine, or on their own phone paired with a QR code, the operator scans their badge, scans the step and starts the job. They pick a reason when they pause and enter good and scrap quantities when they finish.
The stops that cost a mold shop the most are built-in reasons: setup and changeover, first-piece approval, tool breakage or change, waiting for material. At the end of a month you know how much machine time went into setups and waiting.
Rework does not disappear: a finished step can be restarted as a revision, and the time spent recutting the part is recorded too.
See the bottleneck before assembly day
The deadline feasibility card on each project compares the mold's remaining work with the capacity of each resource group up to the due date, after the other open work already queued there. If wire EDM is booked solid until the deadline, the card names it as the bottleneck and estimates a finish date. It does not model setup sequence or operator availability; its job is to move the surprise earlier than assembly day.
The live shop floor view and per-group TV boards show which mold's part is on which machine. The production status report covers workload, plan versus actual and operator hours, and every table exports to Excel.
Real hours for the next quote
When a mold ships, you have the actual minutes for every operation on every part. Each night ModernMES recalculates the typical (median) time of every operation from that history and suggests it on new routings, so EDM and machining hours on the next quote come from records instead of estimates.
First-piece and final inspection results are kept on the work order with defect types and photos. Machines can have periodic maintenance plans, and finished work can be booked in your ERP through the ERP integration add-on.
Frequently asked questions
Does it track mold life or shot counts?
No. ModernMES tracks the making of molds, not the life or shot count of a mold in production. Each mold you build is tracked as a project with its parts and operations.
Does data come from the machines automatically?
No. Data comes from operators starting, pausing and finishing jobs on the terminal or their phone. Nothing is wired to the machine, so it works the same on a sinker EDM, a wire EDM, an old manual mill or a new machining center.
How is outside processing (heat treatment, coating) handled?
Define it as an operation in the routing and record when it goes out and when it comes back. There is no purchase order or shipping document tracking for subcontractors.
Does it track material and stock?
No. Parts have a simple stock quantity field, but there is no stock ledger, bill of materials or lot tracking. Stock stays in your ERP, and ModernMES can book finished work there as a production receipt.
Can we run it on our own server?
Yes. Besides the cloud version there is an on-premise edition for shops that want their data to stay on site. The cloud version can be tried free for 14 days.
Related pages
- Production Tracking Software for CNC Machine ShopsJob tracking for CNC machine shops: barcoded route cards, operator terminals, a live machine view, real cycle times and deadline feasibility. Free for 14 days.
- Project-Based Production Tracking for Machine BuildersEngineer-to-order tracking for machine builders: projects, parts and operations, deadline feasibility per department, and the actual hours behind each quote.
- How to Calculate OEE: Formula, Example, CalculatorThe OEE formula (availability × performance × quality), a step-by-step worked example on a CNC lathe, the six big losses, common mistakes and a free calculator.
- Moving From Excel to an MES: A Step-by-Step PlanWhy spreadsheet production tracking breaks down, which lists to prepare, and how to move to an MES with a pilot area and a short parallel run, without stopping work.