Job tracking software for sheet metal and steel fabrication shops
In a shop that does laser cutting, press brake work, welding and coating, a job drops out of sight the moment it leaves the laser. Parts mix with other orders at bending, welding and paint. ModernMES shows which station every part of every order is waiting at, and whether the delivery date will hold.
Last updated: 19 November 2026
The short answer
ModernMES is cloud production tracking software that keeps a fabrication order as a project, its parts as project parts, and steps such as laser cutting, bending, welding and coating as work orders. Operators start and finish jobs on a shared tablet or their phone, and can open the STEP model of the part on the same screen. Nothing has to be connected to the machines. The trial is free for 14 days.
Where does a job go after cutting?
A laser cuts parts for dozens of orders in a shift. What follows is slower: the queue at the press brake, the weld fixture, grinding and coating. When a subcontract customer rings, the answer is usually "let me check and call you back".
- Are the parts of this order bent, or still waiting at welding?
- How many hours of work are queued in front of the press brake this week?
- Which machine is this chassis on right now, and who has it?
- How many hours did this job really take, and was the quote right?
Each order is a project, each part has its own routing
You open the order as a project. Every part is a line in the project and carries its own steps. A flat cover goes through cutting and coating only, a chassis through cutting, bending, welding, grinding and coating. Repeat parts get a default routing. The parts list can be imported from a spreadsheet.
Each step lands as a work order in the queue of its resource group. On the production plan you can assign jobs to machines and operators. The project screen shows which step every part is at.
Operators open the 3D model of the part
At bending and welding the operator often needs more than a paper drawing. You upload the 3D model to the part. When a job for that part is selected at the terminal, an "Open 3D model" button appears. The operator can rotate the model, cut a section through it and measure between two points.
- STEP and IGES files open directly. STL, OBJ, GLB, 3MF and PLY are supported as well.
- If you want, you can build step-by-step work instructions on the model: which bend comes first, which face is welded.
- The drawing can be attached to the part as a PDF or an image.
Recording work and downtime reasons
The operator picks their name on the tablet or scans their badge and starts the job. When they pause they choose a reason, such as waiting for material, tool change or breakdown. When they finish they enter good and scrap quantities. Times are recorded automatically, and the live shop floor view shows which order is on which machine.
If you want, the running and stopped state of the laser or the press brake can be brought in from the machine later. It is not needed to get started.
Delivery dates, actual hours and quotes
The deadline feasibility card on every project compares the remaining work with the capacity of each resource group up to the delivery date and names the bottleneck. When a job is done, the actual time of every step is on record next to its estimate, and the next quote draws its times from those records.
To be clear about what it does not do: ModernMES does not nest parts or send programs to a machine, and it does not do accounting or invoicing. You can look around the live shop floor demo or compare plans in the pricing guide.
Frequently asked questions
Does it suit a small subcontract cutting shop?
Yes. Shops with one laser and one press brake can use it. Modules you will not use leave the menu during setup.
Does it replace my nesting software?
No. Nesting and cutting programs stay in the software you already use. ModernMES follows the parts and their times through the shop after cutting.
How does an operator see the STEP file?
You upload the model to the part once. The operator selects the job at the terminal and presses "Open 3D model". There is nothing to install.
Does it talk to an ERP?
Yes. The integrations page lists the supported ERP connections and the API.
Related pages
- Job Tracking for Make-to-Order and Custom Fabrication ShopsFor stone, glass, joinery and steel shops that make to order: quote to project, quantities in square metres, shop floor recording on a tablet, delivery date checks and a status link for the customer.
- Real-Time Production Tracking for CNC Machine ShopsReal-time job tracking for CNC machines: operator terminals, a live view of which job runs on which machine, downtime reasons, real cycle times. Free for 14 days.
- Job Shop Quoting: How to Quote a Machining JobHow to quote machining jobs: setup and run time, machine hourly rates, material, outside processing and markup, with a worked example and common mistakes.
- Machine Downtime Tracking: Downtime Reasons and AnalysisHow to track machine downtime: a short list of downtime reasons, paper vs Excel vs software, Pareto analysis, MTTR and MTBF, and common mistakes.
- MES Software Pricing 2026: Average Cost per Machine, User and SetupWhat does MES software cost on average? Published prices run €190 to €320 per machine a month for shop floor monitoring and $49 to $149 per user for cloud MRP. Setup, hidden costs, discounts and ModernMES prices.