Production tracking software for plastic injection molding
In injection molding, losses rarely come from one big breakdown. They come from mold changes, waiting for material, startup scrap and short stops nobody writes down. ModernMES records when and why each machine stopped, and how many good parts and how much scrap each job made, on the shop floor as it happens.
Last updated: 2 November 2026
Where the losses hide in injection molding
- A mold change runs longer than planned but shows up as one line on the shift sheet.
- Time spent waiting for resin drying or a color change never gets recorded.
- Short stops, such as a stuck part or a waiting robot, add up over a day to more than a breakdown.
- Counts and scrap written at the end of the shift come from memory, with no split between flash, short shots and sink marks.
- When a customer asks which resin lot went into a batch, someone searches the delivery notes.
Getting the machine state automatically
Most injection molding machines can give a running or stopped state through a PLC output. ModernMES takes that state from ModernMES Connector on a computer in the factory, a PLC gateway, a Node-RED flow, a sensor box or a script over HTTP or MQTT, and shows the machine as running, idle, stopped, in alarm or offline. It is set up under machine signals in the settings.
In the mode where the signal sets the machine's status, a stop nobody recorded opens as an unexplained stop once it passes the time you choose (5 minutes by default), and the operator gives the reason afterwards. Short stops get recorded without anyone having to remember them.
The signal comes from ModernMES Connector on a computer in the factory, from a PLC gateway or from a sensor box, and it can also carry the machine's shot counter. On machines with EUROMAP 77 (OPC UA), Connector can read the state and the cycle counter. ModernMES Connector is new and its drivers have been tried in a test setup, so we do the first installation together with you. If you set the machine's counting to Machine, each rise in the counter is written live to the running job. For multi-cavity molds you enter the number of cavities as parts per cycle. Otherwise operators enter the good count when they finish a job. Scrap is always entered by the operator. Machine signals are optional. On machines without one, downtime comes from the operator's pause records.
Downtime reasons
Operators pick a reason when they pause a job on the terminal or their phone. Setup and mold change, first-part approval, machine breakdown, waiting for material and quality problem come ready, and you add your own, such as resin drying or color change, in the settings. Each reason is marked up front as counting toward OEE or not.
The panel raises an alert when a machine has been stopped for more than 5 minutes and when a stop has gone unexplained for 10 minutes, and both times can be changed. How to build the reason list is covered in the machine downtime tracking guide, and what a stop costs you in the downtime cost calculator.
Scrap and quality
Operators enter good and scrap counts when they finish a job. Scrap is logged with its defect type and, when needed, a note and photos. The defect types are your list. Burr comes ready, and you add types such as short shot, sink mark, flow lines or color variation yourself. First-article, in-process and final inspection results are kept against the work order, and the quality report ranks defects by type.
Resin lots and traceability
Incoming resin or masterbatch is recorded as a material lot with the supplier's batch number and certificate details. The batch you mold is a production lot, and how much it consumed from which material lot is entered in the panel by an admin or manager. After a complaint you can go from the batch to its material, or from a material lot to every batch it went into. There is more in the lot traceability guide.
Maintenance
You can set a daily, weekly, monthly or yearly maintenance plan for each machine, and the work order for maintenance that falls due opens by itself in the morning.
Molds are kept as records of their own on the Tools and molds page. For each mold you enter the number of cavities, how many shots it runs until maintenance and which machine it is mounted on. When a job finishes on that machine, the good and scrap count is divided by the cavities and added to the mold's shot counter. If the machine's counting is set to Machine, the parts the machine counted are included. You get a notice when the counter reaches the warning level (90% by default) and when the life is used up. After maintenance you reset the counter, and the old value and what was done stay in the history.
The counter moves when a job finishes, not with every shot. When a mold moves to another machine, you change that in the panel. No maintenance work order opens by itself for a mold that reached its life. Mold life tracking is in the Enterprise plan and is switched on under Settings → Modules.
Live screens and OEE data
The live shop floor screen shows which job is running on which machine and which machine has stopped, and you can open separate TV boards for the floor. Because stops are recorded with reasons and counts as good and scrap, the inputs for OEE build up every shift. You can see the calculation itself in the OEE calculator.
Getting started
You can try ModernMES free for 14 days without a credit card. You do not need machine signals to begin. Start with the operator terminal and add signals later. For companies that do not want data to leave the site, it can also be installed on your own server. You can see the system first in the live shop floor demo.
Frequently asked questions
Does ModernMES read the shot count from the injection molding machine?
It can. If the machine supports EUROMAP 77 (OPC UA), ModernMES Connector on a computer in the factory reads the shot counter and sends it. A PLC gateway or Node-RED can send it too. If the machine's counting is set to Machine, the shots go to the running job, multiplied by the number of cavities. Otherwise operators enter the good count when they finish a job. Scrap is always entered by the operator.
Can it be used without machine signals?
Yes. Operators start the job on a terminal or phone, pick a reason when pausing and enter the count when finishing. Signals can be added later to catch stops nobody records.
Does it track mold maintenance?
Yes, on the Enterprise plan. Each mold has its own record on the Tools and molds page, and its shot counter moves with the jobs finished on the machine it is mounted on. You get a notice as it nears the life you set and when the life is used up, and you reset the counter after maintenance. Machines can also have periodic maintenance plans.
Can I see which resin lot went into a batch?
Yes. Material lots are recorded with the batch number and certificate details, and which material lots a production lot consumed is entered in the panel. You can trace from a batch to its material or from a material to its batches.
Related pages
- Injection Molding Production Log: Free Excel TemplateFree injection molding production log for Excel. Shots, cavities, average cycle time, performance, scrap rate and uncounted parts, worked out per shift.
- Mold Tracking Template for Excel (Free)Free mold tracking template for Excel. Log finished jobs and get shot counts from cavities, shots left until maintenance and a status for every mold.
- Machine Downtime Tracking: Downtime Reasons and AnalysisHow to track machine downtime: a short list of downtime reasons, paper vs Excel vs software, Pareto analysis, MTTR and MTBF, and common mistakes.
- Downtime Cost Calculator: What Machine Downtime Costs YouFree downtime cost calculator. Work out what a machine stop costs per minute and per year from lost output, contribution margin, idle labor and repair costs, with an example.
- Lot Traceability Software for Batch ManufacturingBatch traceability in manufacturing: heat numbers, certificates, two-way genealogy for recalls, and a QR product passport with energy estimates.
- OEE Calculator: Calculate OEE With a Worked ExampleFree OEE calculator. Enter planned time, downtime, ideal cycle time and counts and get OEE as you type, with a worked example, the formula and common mistakes.