Skip to content

Injection Molding Production Log (Free Excel Template)

An injection molding production log keeps the shot count, good parts and scrap side by side for every machine, job and shift. In this free Excel template the average cycle time, performance, scrap rate and the parts the counter saw but nobody counted are worked out by formulas.

Last updated: 8 November 2026

Who is it for?

For molders who run their presses on shifts. The shift book usually holds just a part count. This log also records shots, cavities and the planned cycle time, so you can see whether the machine ran at the planned speed and whether the counted parts match the counter.

Preview and download

These are the first sample rows. Average cycle, total parts, performance, scrap rate and uncounted parts are formulas.

MachineMoldCavitiesPlanned cycle (s)Run time (min)ShotsGoodScrapAvg cycle (s)PerformanceScrap rateUncounted
IMM-01M-1038124201,88014,90014013.489.5%0.9%0
IMM-03M-1014284508703,4206031.090.2%1.7%0
IMM-05M-1022453905009682446.896.2%2.4%8
IMM-01M-1038123001,45011,5208012.496.7%0.7%0

Excel (.xlsx), four sheets. Production log, summary by machine and by scrap reason with a chart, lists of machines, scrap reasons and shifts, and a detailed how-to with a worked example. No email needed.

Download the injection molding production log

In the third row the counter shows 1,000 parts, but good plus scrap is 992. The 8 parts in between were either never counted or are scrap nobody wrote down. The scrap rate is above 2%, so it shows red in that row. In the first row the average cycle is 13.4 seconds against a plan of 12, so while it ran the machine was about 10% slower than planned.

Formulas

ColumnFormula
Avg cycle (s)Run time × 60 / Shots
Total partsShots × Cavities
PerformanceTotal parts / (Run time × 60 / Planned cycle × Cavities)
Scrap rateScrap / (Good + Scrap)
Uncounted partsTotal parts - Good - Scrap

Performance is one of the three parts of OEE. As long as stops are kept out of the run time, this column shows only speed loss. Keep the stops in the downtime tracking template, and use the OEE template for the full OEE.

How to use it

  1. On the Lists sheet, set up your machines, scrap reasons and shifts. Name the scrap reasons the way your operators say them.
  2. Start one row per machine, job and shift. Take the planned cycle from the process sheet or the quote.
  3. Read the shot counter at the start and at the end of the shift and enter the difference as shots.
  4. Enter the minutes the machine actually ran on that job as run time, without the stops.
  5. Enter the good and scrap counts and, if there was scrap, its main reason. The Summary sheet adds it up by machine and by reason.

When a spreadsheet stops being enough

When the counter reading, run time and scrap are written down by hand at the end of the shift, short stops and their reasons get lost. And when the log shows uncounted parts, it is hard to find out what happened and when.

In ModernMES the machine's running or stopped state comes over HTTP or MQTT from ModernMES Connector on a computer in the plant, from a PLC gateway or from a sensor box. If the signal also carries the shot counter and the machine's count source is set to Machine, shots are multiplied by the cavities and written to the running job live. The operator enters scrap together with its defect type. See plastic injection molding for the details.

Frequently asked questions

How do you calculate cycle time in injection molding?

Divide the time the machine ran by the number of shots. A machine that made 1,880 shots in 420 minutes has an average cycle of 420 × 60 / 1,880 = 13.4 seconds. If stops stay in the run time, the cycle looks longer than it is.

Why does the number of cavities matter?

A multi-cavity mold makes more than one part per shot. With an 8-cavity mold, 1,880 shots are 15,040 parts. Mixing up shots and parts makes both performance and the scrap rate wrong.

Where do uncounted parts come from?

Usually from setup shots and from parts that were dropped or broken and never written down. If one machine shows them all the time, look at how parts and scrap are counted on that machine.