Scrap tracking template for Excel (free)
A scrap log records how many parts each job scrapped, why, and what that cost. In this free Excel template the scrap rate and scrap cost are calculated for you, and the Analysis sheet totals scrap by reason and by machine so you can see where most of it comes from.
Last updated: 8 November 2026
Who is it for?
Shops that know their scrap only as one total and do not record where and why it happens. Logging the count with a reason turns "we scrap too much" into "out-of-tolerance scrap is concentrated on CNC-01".
Preview and download
The sample rows look like this. Scrap rate and scrap cost are formulas, and the reason comes from a list.
| Date | Work order | Operation | Machine | Made | Scrap | Reason | Scrap rate | Unit cost | Scrap cost |
|---|---|---|---|---|---|---|---|---|---|
| 2026-10-27 | WO-1042 | OP10 Turning | CNC-01 | 118 | 3 | Out of tolerance | 2.5% | 145.00 | 435.00 |
| 2026-10-27 | WO-1043 | OP20 Milling | CNC-02 | 80 | 2 | Setup piece | 2.5% | 60.00 | 120.00 |
| 2026-10-27 | WO-1039 | OP10 Milling | Mill-01 | 52 | 2 | Tool mark | 3.8% | 95.00 | 190.00 |
| 2026-10-27 | WO-1042 | OP10 Turning | CNC-01 | 136 | 3 | Material defect | 2.2% | 145.00 | 435.00 |
| 2026-10-28 | WO-1045 | OP10 Turning | Lathe-01 | 196 | 0 | 0.0% | 22.00 | 0.00 |
Excel (.xlsx), four sheets: scrap log, analysis by reason and by machine with a chart, lists and a detailed how-to. No email needed.
Download the templateIn the sample, 25 scrapped parts cost 3,575 in total. Out of tolerance, with 12 parts, makes up 48% of the scrap count.
Columns and formulas
| Column | What goes in | Formula |
|---|---|---|
| Date, work order, part, operation | The job the scrap came from | None |
| Machine, operator | Machine from a drop-down list | None |
| Made | Total, good plus scrap | None |
| Scrap | Enter 0 when there was none | None |
| Scrap reason | From the list | None |
| Scrap rate | Calculated | Scrap divided by made |
| Unit cost | Cost of the part up to this operation | None |
| Scrap cost | Calculated | Scrap times unit cost |
Use the cost of material and work spent on the part up to that operation as the unit cost, not its selling price. Scrap at the last operation costs more than scrap at the first, because all the earlier work goes in the bin with it.
How to use it
- Edit your machines and scrap reasons on the Lists sheet, in the words your operators use.
- Fill in one row per job or operation. Enter 0 when there was no scrap so the rate stays right.
- Enter the unit cost if you know it and the scrap cost follows.
- Write down the action taken. If the same reason keeps coming back, the action did not work.
- Look at the Analysis sheet once a week. The reason and the machine with the most scrap are where improvement starts.
When a spreadsheet stops being enough
A scrap count is only reliable when it is written down as the job finishes. Counts collected at the end of the day get rounded and the reasons blur, and while the record sits in a file the quality lead sees the problem the next day.
In ModernMES the operator enters good and scrap counts when finishing a job on the terminal or a phone. With the quality module on, a quality check records defective parts by defect type, with a note and photos. You define the defect types in Settings, and the quality report ranks defects by type. See production tracking software.
Frequently asked questions
How do you calculate the scrap rate?
Divide the scrap count by the total made. With 3 scrapped out of 118 made, the scrap rate is 3 / 118 = 2.5%. The total made includes both good and scrapped parts.
How do you calculate the cost of scrap?
Multiply the scrap count by the part's unit cost up to that operation: the material plus the machine and labour time spent on it so far.
Should setup pieces count as scrap?
Yes. Parts used up during setup are real material and time. Log them under their own reason and you also see how much scrap setups cause.
Related pages
- Production Tracking Spreadsheet: Free Excel TemplateFree production tracking spreadsheet for Excel. Log machine, operator, work order, time, good and scrap counts. Scrap rate and machine totals are built in.
- Downtime Tracking Template for Excel (Free)Free machine downtime tracking template. Log when a machine stopped and why, and get minutes, groups and a Pareto by reason from the built-in formulas.
- How to Calculate OEE: OEE Formula and Calculation ExampleThe OEE formula (availability × performance × quality), a step-by-step worked example on a CNC lathe, the six big losses, common mistakes and a free calculator.
- Lot Traceability Software for Batch ManufacturingBatch traceability in manufacturing: heat numbers, certificates, two-way genealogy for recalls, and a QR product passport with energy estimates.