Skip to content

Production tracking spreadsheet (free Excel template)

Which job ran on which machine, who ran it, how long it took, and how many good and scrap parts came out? This free production tracking spreadsheet puts those answers in one Excel file. Time, scrap rate and machine totals are calculated, so you only type what happened on the floor.

Last updated: 8 November 2026

Who is it for?

Shops that still track production on paper or in scattered spreadsheets: machining, welding, assembly or any job shop that works to order. It is also a good way to find out what you want to measure before you choose production tracking software.

Preview and download

The sample rows in the file look like this. Time, scrap and scrap rate are formulas.

DateShiftMachineWork orderOperationMinPlannedMadeGoodScrapScrap rate
2026-10-27DayCNC-01WO-1042OP10 Turning21012011811532.5%
2026-10-27DayCNC-02WO-1043OP20 Milling22580807822.5%
2026-10-27DayMill-01WO-1039OP10 Milling19560525023.8%
2026-10-27EveningCNC-01WO-1042OP10 Turning24014013613332.2%
2026-10-28DayLathe-01WO-1045OP10 Turning15020019619600.0%

Excel (.xlsx), four sheets: production log, summary by machine, lists and a detailed how-to. Formulas ready in 300 rows. No email needed.

Download the spreadsheet

The Summary sheet adds the same rows up per machine. In the sample, CNC-01 ran 1,290 minutes over four shifts and made 454 parts, 439 of them good, a 3.3% scrap rate.

Columns and formulas

ColumnWhat goes inFormula
Date, shift, machineWhen and where the job ran. Shift and machine come from drop-down lists.None
Operator, work order, part, operationWho ran which jobNone
Start, endClock times such as 08:00 and 11:30None
Time (min)CalculatedEnd minus start in minutes, also past midnight
Planned, made, goodMade is the total, good plus scrapNone
ScrapCalculatedMade minus good
Scrap rateCalculatedScrap divided by made
Vs planCalculatedGood divided by planned

How to use it

  1. Put your machines and shifts on the Lists sheet. The drop-downs on the log come from there.
  2. Fill in one row per job or operation. If a job carries on into the next shift, start a new row.
  3. Fill the row in when the job ends, not at the end of the day. End-of-day entries round the times and forget the short jobs.
  4. Look at the Summary sheet once a week. It shows the machine with the most scrap. The jobs that fell behind plan show in the Vs plan column of the log.
  5. Leave unused rows empty rather than deleting them. The formulas are ready in the first 300 rows.

When a spreadsheet stops being enough

This sheet is a good way to make production visible. Its limit is that every row is typed after the fact. The file sits on an office PC, so nobody on the floor can see where a job is right now, and once several people edit the same file the rows start to clash.

In ModernMES the operator starts a job on a terminal or a phone by scanning the barcode or QR code on the job card, picks a reason when pausing, and enters good and scrap counts when finishing. Start and end times are recorded on their own, and the live shop floor view shows which job runs on which machine. You can import your parts and routings from Excel. See production tracking software and the guide to moving off spreadsheets.

Frequently asked questions

Is the spreadsheet free?

Yes. Download it without an email address and change it to fit your shop.

Does it work in Google Sheets or LibreOffice?

Yes. The formulas are standard functions (IF, ROUND, MOD, SUMIF), and the drop-downs work in Google Sheets too.

How is the scrap rate calculated?

Scrap is made minus good, and the scrap rate is scrap divided by made. With 118 made and 115 good, scrap is 3 and the scrap rate is 2.5%.

Can I print it and fill it in by hand?

Yes. Print settings are A4 landscape with the header row repeated on every page. Type the paper entries in later and the totals and rates still work.