OEE Excel template (free)
This OEE spreadsheet calculates availability, performance, quality and OEE for every machine and shift with built-in formulas. Enter planned time, downtime, ideal cycle time and counts, and that is it. The By machine sheet gives OEE weighted by time rather than as an average of shifts.
Last updated: 8 November 2026
Who is it for?
Shops and plants that want to start measuring OEE before they have a system for it. For a one-off number the OEE calculator is quicker. This file is for keeping a log per day and shift and comparing machines.
Preview and download
The sample rows look like this. Run time and the four ratios are formulas. The first row is the worked example from our OEE guide.
| Machine | Planned (min) | Down (min) | Run (min) | Ideal cycle (s) | Total | Good | Availability | Performance | Quality | OEE |
|---|---|---|---|---|---|---|---|---|---|---|
| CNC-01 (day) | 450 | 45 | 405 | 30 | 700 | 665 | 90.0% | 86.4% | 95.0% | 73.9% |
| CNC-02 (day) | 450 | 80 | 370 | 42 | 470 | 461 | 82.2% | 88.9% | 98.1% | 71.7% |
| CNC-01 (evening) | 450 | 30 | 420 | 30 | 760 | 742 | 93.3% | 90.5% | 97.6% | 82.4% |
| Lathe-01 (day) | 450 | 120 | 330 | 25 | 610 | 604 | 73.3% | 77.0% | 99.0% | 55.9% |
| Mill-01 (day) | 450 | 60 | 390 | 55 | 380 | 366 | 86.7% | 89.3% | 96.3% | 74.6% |
Excel (.xlsx), four sheets: OEE log, OEE by machine, lists and a detailed how-to that walks through the formulas. OEE is colour-scaled. No email needed.
Download the OEE templateThe OEE formulas
| Ratio | Formula | First row |
|---|---|---|
| Run time | Planned time − Downtime | 450 − 45 = 405 min |
| Availability | Run time / Planned time | 405 / 450 = 90.0% |
| Performance | (Total count × Ideal cycle) / Run time | (700 × 30 s) / (405 × 60 s) = 86.4% |
| Quality | Good count / Total count | 665 / 700 = 95.0% |
| OEE | Availability × Performance × Quality | 90.0% × 86.4% × 95.0% = 73.9% |
The ideal cycle time goes in seconds and the sheet converts it. Use the fastest realistic time the machine makes that part in, not the time in the quote. Performance above 100% means the ideal cycle is set too long or the count is wrong. The formulas are explained in how to calculate OEE.
Why the machine summary is not an average
Averaging shift OEE values to get a machine's weekly OEE is a common mistake. A short shift counts as much as a long one and the result is off. The By machine sheet adds up times and counts first and works the ratios out from the totals.
In the sample, CNC-01's four shifts are 73.9%, 82.4%, 50.6% and 84.0%. OEE from the totals is 72.5%: 1,510 of 1,770 planned minutes were run, and 2,568 of 2,660 parts were good. A plain average would give 72.7%. The shifts are almost the same length, so the gap is small here, and it grows as shift lengths differ.
How to use it
- Put your machines and shifts on the Lists sheet.
- Enter one row per machine and shift. Leave breaks out of planned time: planned time is the time the machine was meant to run.
- Under downtime, enter every unplanned stop such as breakdowns, setups and waiting for material. To log stops one by one, use the downtime tracking template.
- Total count is everything made, good and scrap. Good count is only the parts that were right first time.
- Check the By machine sheet weekly. The lowest ratio shows where that machine loses the most.
When a spreadsheet stops being enough
OEE is only as good as the data under it. If stops are written from memory, availability looks better than it is, and if counts are guesses, performance means little. Most shops that keep OEE in Excel find that the hard part is collecting the data, not the formula.
In ModernMES the raw data for OEE is collected on the floor as it happens. The operator picks a downtime reason when pausing a job and enters good and scrap counts when finishing it. Connect a machine's signal and stops are recorded even when nobody presses anything. See production tracking software.
Frequently asked questions
How do you calculate OEE in Excel?
Enter planned time, downtime, ideal cycle time, total and good counts per row. Availability = (Planned − Down) / Planned, Performance = Total × Ideal cycle / Run time, Quality = Good / Total, and OEE is the product of the three. The formulas are ready in this file.
What is a good OEE score?
85% is often quoted as "world class", but it is a benchmark, not a law. A job shop that runs a different part every day with frequent setups cannot have the same target as a high-volume line. Compare with your own last month, not with another plant.
Why is performance above 100%?
The ideal cycle time is set longer than it really is, or the total count is wrong. The ideal cycle should be the fastest realistic time for that part on that machine.
Does it work in Google Sheets?
Yes. The formulas are standard functions (IF, SUMIF, SUMPRODUCT) and the colour scales carry over.
Related pages
- OEE Calculator: Calculate OEE With a Worked ExampleFree OEE calculator. Enter planned time, downtime, ideal cycle time and counts and get OEE as you type, with a worked example, the formula and common mistakes.
- How to Calculate OEE: OEE Formula and Calculation ExampleThe OEE formula (availability × performance × quality), a step-by-step worked example on a CNC lathe, the six big losses, common mistakes and a free calculator.
- Downtime Tracking Template for Excel (Free)Free machine downtime tracking template. Log when a machine stopped and why, and get minutes, groups and a Pareto by reason from the built-in formulas.
- Machine Downtime Tracking: Downtime Reasons and AnalysisHow to track machine downtime: a short list of downtime reasons, paper vs Excel vs software, Pareto analysis, MTTR and MTBF, and common mistakes.