Mold Tracking Template for Excel: Shot Counts and Maintenance (Free)
A mold tracking sheet shows, for every mold, how many shots it has run, when it was last maintained and how many shots are left before the next maintenance. In this free Excel template you enter the count of each finished job. The shots are worked out from the cavities, and a mold that is close to its maintenance is flagged in color.
Last updated: 8 November 2026
Who is it for?
Injection molders, die casters and press shops that run their own molds. Mold maintenance is often remembered only when something breaks. Nobody knows how many shots a mold has done, so preventive maintenance comes late or not at all. This template keeps each mold's shots and maintenance history together in one file, a simple mold history you can actually keep up to date.
Preview and download
These are the sample rows on the Mold cards sheet. Total shots, last maintenance, shots left, used and status are formulas.
| Mold no. | Part | Cavities | Interval | Total shots | Last maintenance | Since maintenance | Left | Used | Status |
|---|---|---|---|---|---|---|---|---|---|
| M-101 | Lid Ø80 | 4 | 16,000 | 197,000 | 2026-10-20 | 15,000 | 1,000 | 93.8% | Due soon |
| M-102 | Crate base | 2 | 30,000 | 51,000 | 2026-10-25 | 6,000 | 24,000 | 20.0% | OK |
| M-103 | Clip | 8 | 100,000 | 102,000 | 102,000 | −2,000 | 102.0% | Maintenance due |
Excel (.xlsx), five sheets. Mold cards, shot log, maintenance log, machine and maintenance type lists, and a detailed how-to with a worked example. No email needed.
Download the templateM-103 has no maintenance row yet, so every shot it has run counts as a shot since maintenance and the mold shows as due. Once you enter its real last maintenance as a row on the Maintenance log sheet, the count starts from there.
The shot log
You add one row for each finished job. Pick the mold from the list and the cavities come from its card. The shots are good plus scrap divided by the cavities, rounded up. Scrap counts too, because the mold closed for those parts as well.
| Date | Mold no. | Machine | Work order | Good | Scrap | Cavities | Shots |
|---|---|---|---|---|---|---|---|
| 2026-10-21 | M-101 | IMM-03 | WO-2201 | 15,840 | 160 | 4 | 4,000 |
| 2026-10-22 | M-102 | IMM-05 | WO-2202 | 7,950 | 50 | 2 | 4,000 |
| 2026-10-23 | M-101 | IMM-03 | WO-2205 | 19,900 | 100 | 4 | 5,000 |
| 2026-10-24 | M-103 | IMM-01 | WO-2207 | 95,600 | 400 | 8 | 12,000 |
Formulas
| Column | Formula |
|---|---|
| Shots | (Good + scrap) / cavities, rounded up |
| Total shots | Starting shots + every shot log row of that mold |
| Shots at last maintenance | Shots built up to the date on the last maintenance row |
| Shots since maintenance | Total shots − shots at last maintenance |
| Shots left | Maintenance interval − shots since maintenance |
| Used | Shots since maintenance / maintenance interval |
When Used passes the warning level, the status turns amber and reads Due soon. When the interval is used up it turns red and reads Maintenance due. You set the warning level per mold. In the sample, M-103 uses 85%.
How to use it
- Enter each mold on the Mold cards sheet with its cavities, the shots it should run between two maintenances and the warning level.
- Under Starting shots, enter the mold's total shots today. If you don't know, enter 0.
- Enter the mold's last maintenance as a row on the Maintenance log sheet.
- For each finished job, enter the mold, good parts and scrap on the Shot log sheet.
- When you maintain a mold, enter the date, the maintenance type and the work done on the Maintenance log sheet. The shots at that moment are worked out for you.
Enter maintenance in date order. The last maintenance is read from the mold's lowest row on the list.
When a spreadsheet stops being enough
In a spreadsheet the shot count only moves when someone types in the job count. One shift that nobody logs can push a maintenance back by weeks. And when a mold moves to another machine or a maintenance is forgotten, nobody gets a warning.
In ModernMES, molds have their own records on the Tools and molds page. For each mold you enter the cavities, how many shots it runs until maintenance and the machine it is mounted on. When a job finishes on that machine, the good and scrap count is divided by the cavities and added to the mold's shot counter. You get a notice when the counter reaches the warning level and when the life is used up. After maintenance you reset the counter, and the old value stays in the history. Mold life tracking is part of the Enterprise plan and is switched on in Settings, on the Modules page. More on the plastic injection molding page.
Frequently asked questions
What should a mold history record include?
How many shots the mold has run since its first day, and which maintenance and repairs were done and when. In this template the mold card, the shot log and the maintenance log together make up that history for each mold.
How do you count mold shots?
Take all the parts from a job, good and scrap together, divide by the number of cavities and round up. On a 4-cavity mold, 16,000 parts are 4,000 shots. If the machine has a shot counter, the difference between its reading at the start and end of the shift is the shot count itself.
How often should a mold be maintained?
Start with the number of shots your toolmaker recommends. After a few maintenances, look at your own records. If problems show up before the interval is reached, shorten it. If the mold shows no wear at maintenance, lengthen it.
Related pages
- Production Tracking Software for Plastic Injection MoldingProduction tracking for injection molders. Downtime from machine signals, reasons for mold changes and short stops, scrap by defect type, resin lot traceability and maintenance plans.
- Mold and Die Shop Production Tracking SoftwareTrack every mold as a project with its parts and CNC, EDM, wire EDM and grinding steps. See the bottleneck before assembly day. Cloud or on-premise.
- Injection Molding Production Log: Free Excel TemplateFree injection molding production log for Excel. Shots, cavities, average cycle time, performance, scrap rate and uncounted parts, worked out per shift.
- Preventive Maintenance Schedule Template for Excel (Free)Free preventive maintenance schedule template for Excel. A maintenance plan per machine, intervals in days or run hours, next due dates, overdue flags and a maintenance log.
- Downtime Tracking Template for Excel (Free)Free machine downtime tracking template. Log when a machine stopped and why, and get minutes, groups and a Pareto by reason from the built-in formulas.