Preventive maintenance schedule template for Excel (free)

A preventive maintenance schedule keeps in one place which task is due on which machine, how often, and when it was last done. In this free Excel template you set each interval in days or in run hours. The next due date, the time left and overdue tasks are worked out by formulas from the maintenance log.

Last updated: 8 November 2026

Who is it for?

Shops that keep maintenance in someone's head or on a sheet taped to the machine. If you cannot see at a glance which oil change, filter clean or axis check is overdue, this template helps. It is not a breakdown report or a maintenance work instruction. It is the calendar of planned maintenance.

Preview and download

Sample rows from the Maintenance plan sheet. Last done and next due are formulas fed by the maintenance log.

CodeMachineTaskIntervalLast doneNext due
M-01CNC-01Lubrication unit level check, way lube7 days2026-10-262026-11-02
M-02CNC-01Coolant concentration and filter cleaning30 days2026-10-052026-11-04
M-03CNC-01Hydraulic oil and filter change2,000 hours4,120 h6,120 h
M-04CNC-02Axis backlash and reference check90 days2026-08-152026-11-13
M-06Mill-01Spindle bearing temperature and noise check1,000 hours3,350 h4,350 h
M-07Weld-01Torch, cable and earth clamp check30 days2026-10-012026-10-31

Excel (.xlsx), four sheets: maintenance plan, maintenance log, machines with hour meters, and a detailed how-to with worked examples. No email needed.

Download the template

For tasks by run hours, the time left comes from the current hour meter reading you keep on the Lists sheet. In the sample, Mill-01 reads 4,310 hours, so its bearing check is 40 hours away. The warning is set to 50 hours, so the status reads Due soon. For tasks by days, the status is Overdue, Due soon or OK depending on the day you open the file.

How to set maintenance intervals

Start with the machine's manual. Manufacturers tie most maintenance to either the calendar or run hours. If there is no manual, the intervals below are a reasonable start. Then tighten or relax them based on your breakdown records.

TaskStarting intervalWho does it?
Oil level, way lube, air service unitDaily or weeklyOperator
Coolant, chip tray, filtersWeekly or monthlyOperator or maintenance
Axis backlash, reference, belt tensionEvery 3 monthsMaintenance
Hydraulic oil and filter changeRun hours from the manual, or yearlyMaintenance
Electrical cabinet cleaning, terminal checkEvery 6 monthsElectrician

Give the short, frequent checks to operators and the longer jobs to maintenance. A two-minute check at the start of the shift is the cheapest way to catch a breakdown before it happens. On machines whose hours vary from week to week, use run hours instead of the calendar, because wear happens while the machine runs.

How to use it

  1. Put your machines on the Lists sheet. For machines serviced by run hours, add the hour meter reading and update it once a week.
  2. On the Maintenance plan sheet, give each task a code such as M-01. Enter the machine, the task, the interval unit (Days or Hours) and the interval.
  3. Under Warn before, enter how many days or hours ahead you want to be warned.
  4. When you start, enter the last time each task was done on the Maintenance log. A task without a log entry shows No record.
  5. After each job, add a row to the log and pick the code. The machine and task fill in, and last done and next due on the plan update.
  6. Once a week, filter the plan by Status. Overdue and Due soon are that week's maintenance list.

When a spreadsheet stops being enough

A maintenance plan in a spreadsheet warns nobody until someone opens the file. The hour meter is only as accurate as the last time someone typed it in. And when the log lives on different people's computers, the history of each machine gets scattered.

In the ModernMES maintenance module you set up a maintenance plan for each machine. The interval can be daily, weekly, monthly, quarterly or yearly. Every morning the system opens a maintenance order for each plan that is due and sends a notification in the panel. A maintenance order still not started a day after its planned start raises an alert as well. When the order is completed, the next due date is counted from the day it was done. Each order keeps the actual start and finish, hours, notes, and parts and labour cost. Intervals follow the calendar, so for tasks by run hours you can keep using this file. See production tracking software.

Frequently asked questions

What should a preventive maintenance schedule include?

The machine, the task, the interval, when it was last done and when it is next due. Add who is responsible and a log of what was done, and the sheet becomes both a plan and a history. Who did what, when, and which parts were changed is exactly what you need at the next breakdown.

Should intervals be in days or run hours?

If a machine runs about the same hours every day, the calendar is enough. If its hours vary, run hours are more accurate. A machine on two shifts wears twice as fast as one on a single shift. In the file you choose per task.

Does preventive maintenance count as downtime?

Log it, but it usually does not count as a loss. It is planned time set aside to prevent breakdowns. You can log the time with the Preventive maintenance reason in the downtime tracking template, where it comes marked as not a loss.

How do I know maintenance is working?

Watch the mean time between failures (MTBF). If preventive maintenance is done on time, it gets longer. The calculation is in the machine downtime tracking guide.