Work order template for Excel and PDF (free, printable)

A work order puts everything the shop floor needs for a job on one page: what to make, from what, how many, by when and through which operations. This free Excel template has a printable work order form and a work order list that keeps open jobs against their due dates. Planned time for each operation is calculated for you, and the actual time comes from the times the operator writes down. If you fill in work orders by hand, the blank form is also here as a PDF.

Last updated: 11 November 2026

Who is it for?

Shops that make to order and write their work orders by hand or in Word. It works for machining, fabrication, machine building and assembly. It is a production work order, not a maintenance or service work order.

Preview and download

The top of the form holds the work order number, customer, sales order, part, material, quantity, due date and drawing revision. The routing goes underneath. For a sample job the routing looks like this.

StepOperationMachine / stationSetup (min)Time per piece (min)Planned time (min)
10Saw cutBand saw101.5190
20TurningCNC-01453.2429
30DrillingMill-01301.8246
40DeburringBench00.672
50InspectionQC00.560
Total997 min (16.6 hours)

The quantity is 120, so planned time for turning is 45 + 120 × 3.2 = 429 minutes. Once the operator writes down the start and end time, the actual time is worked out too. In the sample, saw cut took 200 minutes against 190 planned, and turning 430 against 429. The form also has columns for good, scrap and a sign-off.

Excel (.xlsx), five sheets: a filled-in sample work order, a blank form (A4 landscape), a work order list that tracks due dates, a status list and a detailed how-to. No email needed.

Download the template

PDF, one A4 landscape page. The blank work order form, to print and fill in by hand.

Download the blank PDF

What should a work order include?

FieldWhy you need it
Work order numberSo the office and the shop floor call the same job by the same name. If you print a barcode or QR code, this is the number it carries.
Customer and sales orderShows which order the job belongs to, and who is waiting when priorities clash.
Part number, name and drawing revisionMaking a part to an old revision is one of the most expensive mistakes a shop can make.
MaterialSo the right material is ready, with the heat or batch number written down if you need it.
Quantity and due dateThe two values that planned time and priority are worked out from.
RoutingWhich machines the job goes through and in what order, with setup time and time per piece for each operation.
Operator fieldsStart, end, good, scrap and a sign-off. Without them a work order is an instruction, not a record.

Work order statuses, the difference between paper and software and what to measure are covered in our work order tracking guide.

How to use it

  1. For each new job, copy the Blank form sheet. Right-click the sheet tab and choose Move or Copy. The Work order sheet is a filled-in example.
  2. Type the job details into the yellow cells and enter the routing in the operations table in the order the job runs. Planned time is calculated as Setup + Quantity × Time per piece, with total minutes and hours at the bottom.
  3. Print the form and send it to the shop floor with the job. At each operation the operator writes down the times and the good and scrap counts, and signs it off. If you fill in the whole form by hand, just print the blank PDF.
  4. When the form comes back, type the times and counts into the copy. Actual time is worked out for each operation, next to the planned time.
  5. Keep open jobs and due dates on the Work order list sheet. Overdue jobs show red and jobs due within two days show yellow.

When a spreadsheet stops being enough

The limit of a paper work order is that you only find out where a job is when the form comes back to the office. The times and counts the operator wrote down also have to be typed into a computer again. As the number of jobs grows, "which machine is this job on?" gets answered by phone or by walking the floor.

In ModernMES, applying a routing to a part opens one work order per operation. The route card prints a Code128 barcode or QR code for each step, and the operator starts the job by scanning it at the terminal. The work order status (draft, planned, in progress, paused, completed, cancelled) changes as it happens, and the project page shows whether the due date will hold. See production tracking software.

Frequently asked questions

Is a work order the same as a production order?

In most shops the two mean the same thing. In some ERP systems a production order covers the whole order, and a work order is a single operation or the job sent to one work center. This form works either way.

How is planned time calculated?

For each operation it is the setup time plus the quantity times the time per piece. For a job of 120 pieces, an operation with 45 minutes of setup and 3.2 minutes per piece takes 45 + 120 × 3.2 = 429 minutes.

Can I use it for maintenance work orders?

It is built for production jobs, with a part, a quantity, a due date and a routing. A maintenance work order needs other fields, such as the asset, the fault, the parts used and the downtime, so this form is not a good fit for it.

Is there a blank printable work order form?

Yes. The Excel file has a Blank form sheet you can print as it is. If you do not use Excel, download the same form as a PDF from the link above and print it. It is one A4 landscape page.

Can I add a barcode to the work order?

You can add one in Excel with a barcode font, but the barcode has to be linked to a system, otherwise nothing happens when you scan it. For a barcode to be useful you need a program that reads it and starts the job.