CNC job tracking spreadsheet (free Excel template)
A CNC job tracking sheet keeps the planned and actual setup time, cycle time and counts of each job side by side. In this free Excel template the planned time, the actual time and the variance between them are calculated for you. Jobs that run far off plan are marked red.
Last updated: 8 November 2026
Who is it for?
Job shops that run CNC lathes and machining centers to order. The main point is to see how well the times in your quotes match what really happens. A shop that logs setup and cycle times for a few weeks usually sees for the first time which parts it loses money on.
Preview and download
The sample rows look like this. Planned time, actual time and variance are formulas.
| Machine | Work order | Part | Qty | Setup planned / actual (min) | Cycle planned / actual (s) | Good | Scrap | Planned time (min) | Actual time (min) | Variance |
|---|---|---|---|---|---|---|---|---|---|---|
| CNC-01 | WO-1042 | Flange Ø120 | 120 | 45 / 55 | 95 / 98 | 117 | 3 | 235 | 251 | 6.8% |
| VMC-01 | WO-1043 | Shaft Ø40 | 80 | 30 / 28 | 150 / 162 | 78 | 2 | 230 | 244 | 6.1% |
| CNC-02 | WO-1039 | Cover | 60 | 40 / 70 | 180 / 175 | 50 | 2 | 220 | 222 | 0.8% |
| Lathe-01 | WO-1045 | Bushing | 200 | 20 / 18 | 45 / 44 | 196 | 0 | 170 | 162 | −4.9% |
Excel (.xlsx), three sheets: CNC job tracking with program number, status and planned and actual times, machine and status lists, and a detailed how-to. No email needed.
Download the templateIn the third row the cover job looks close to plan overall, but setup took 70 minutes instead of 40. The total variance is small, and only keeping setup and cycle time apart shows the gap.
Formulas
| Column | Formula |
|---|---|
| Planned time (min) | Planned setup + Qty × Planned cycle / 60 |
| Actual time (min) | Actual setup + (Good + Scrap) × Actual cycle / 60 |
| Variance | (Actual time − Planned time) / Planned time |
The cell turns red when a job ran more than 10% over plan and green when it finished more than 10% early. Parts and operations that keep coming up red are where the time in the quote needs a second look. How quote times are worked out is covered in our job shop quoting guide.
How to use it
- Put your machines on the Lists sheet.
- Add a row for each CNC job. Take the planned setup and cycle time from the quote or the CAM program.
- Set the status to Setup when the job starts and to Running while it is cutting. Fill in the actual values when it is done.
- Always write down the program number. When the same part comes back, it tells you which program ran and how long it took.
- At the end of the month, list the parts whose variance stays high and use the real time in the next quote.
When a spreadsheet stops being enough
Cycle and setup times kept in Excel are usually what the operator reports, written down after the job is done. The records end up scattered, so when the same part comes back six months later the old times are hard to find.
In ModernMES the real times build up by themselves as the operator starts and finishes each operation by scanning the job card. The typical time of each operation is worked out again every night from past jobs. When you prepare a quote, the real times of the same part, part family or resource group from the last 36 months are used. See CNC machine shops.
Frequently asked questions
How do you measure CNC cycle time?
It is the time from clamping one part to clamping the next. Measure the average over several parts, not a single one. Do not include setup in the cycle time, write it down separately.
Why keep setup time separate?
Setup is spent once per job, cycle time once per part. On small batches setup is most of the total time. If the two get mixed, both the quote and the capacity calculation come out wrong.
What does the variance percentage show?
How much longer or shorter the job took than planned. A variance above 10% says that either the time in the quote or something on the shop floor needs looking at.
Related pages
- Real-Time Production Tracking for CNC Machine ShopsReal-time job tracking for CNC machines: operator terminals, a live view of which job runs on which machine, downtime reasons, real cycle times. Free for 14 days.
- Job Shop Quoting: How to Quote a Machining JobHow to quote machining jobs: setup and run time, machine hourly rates, material, outside processing and markup, with a worked example and common mistakes.
- Work Order Template for Excel & PDF (Free, Printable)Free printable work order template in Excel and as a blank PDF. Routing with planned and actual time per operation, plus a work order list that tracks due dates.
- Production Tracking Spreadsheet: Free Excel TemplateFree production tracking spreadsheet for Excel. Log machine, operator, work order, time, good and scrap counts. Scrap rate and machine totals are built in.