First article inspection form for Excel (free)

A first article inspection form records that the first part after a setup was measured, was within tolerance and was approved before the run started. In this free Excel template you enter each characteristic with its tolerance and get OK / NOK for every reading from a formula. A log sheet shows how often parts are approved at the first attempt and how long the machine waits for a decision.

Last updated: 8 November 2026

Who is it for?

Shops that measure and approve the first part after every setup, tool change or mould change. When approval is given by word of mouth, nobody knows later which dimensions were checked, who approved the part, or how long the machine stood waiting. This form records all three. It is the shop floor check after a setup, not a formal AS9102 first article report for a customer.

Preview and download

The top of the form holds the work order, part, drawing revision, operation, machine, CNC program number, operator and the reason for the setup. Setup time is worked out from the start and finish times. The measurement table follows:

CharacteristicGaugeLower limitUpper limitMeasuredResult
Outer diameter Ø120 h8Micrometer119.946120.000119.982OK
Bore Ø60 H7Bore gauge60.00060.03060.014OK
Overall length 25 ±0.1Caliper24.90025.10025.030OK
Chamfer 1 × 45°Caliper0.8001.2001.100OK
Surface roughness Ra (max 1.6)Roughness tester0.0001.6001.200OK
Burrs and surface appearanceVisualOKOK

All six characteristics are within their limits, so the measurement result reads "Every characteristic is within tolerance". A single NOK would make it read "cannot be approved". Quality writes down the decision, and the operator, quality and the production lead sign.

Excel (.xlsx), five sheets: printable first article form (A4 portrait), first article log, summary, lists and a detailed how-to. No email needed.

Download the form

When is a first article check done?

Whenever you need to show that the machine makes a good part after a setup, before the run starts. The setup reasons in the form cover the usual cases:

  • A new job or a new part
  • A tool, mould or fixture change
  • A change to the CNC program
  • After maintenance or a repair
  • At the start of every shift, if the customer asks for it

Which dimensions to check comes from the critical dimensions on the drawing and the characteristics the customer has marked. Choose the dimensions a setup can upset, not every dimension on the drawing.

The wait for approval

A machine that is set up but not yet approved does not run. In most shops that wait is not even logged as downtime. The First article log keeps the time each part was submitted and the time of the decision, and works out the minutes in between.

Work orderMachineSubmittedDecidedWait (min)AttemptDecision
WO-1042CNC-0109:5510:20251Approved
WO-1043CNC-0210:4011:30501Rejected
WO-1043CNC-0211:5012:05152Approved
WO-1045Lathe-0108:2008:35151Approved

The file has three more rows after these four, one of them approved with conditions. Over all seven rows the Summary sheet shows 83.3% approved at the first attempt and an average wait of 24.3 minutes. Every rejected first article means another setup. A low first-time rate points to the setup, a long wait points to the approval itself.

How to use it

  1. Fill in the job, part, machine and setup details at the top of the First article sheet.
  2. List the characteristics to check with their gauge, nominal and tolerances. Enter the lower tolerance with a minus sign and the limits are calculated for you.
  3. Enter the measured values. For a visual check, leave the nominal empty and write OK or NOK.
  4. Quality picks the decision from the list and writes the reason for a rejection or a condition. The operator, quality and the production lead sign.
  5. Log each submission as a row on the First article log. For each new job, copy the form sheet (right-click the sheet tab, then Move or Copy).

When a spreadsheet stops being enough

With a paper form, quality only learns that a part is waiting when somebody walks over to tell them. And once the signed form is in a binder, nobody checks at the next setup how the same dimension came out last time.

In ModernMES the first article check is a checklist set up for the first piece. The operator fills it in on the terminal, and the number items carry their lower and upper limits. When the checklist passes, the part is marked as waiting for approval, the people in the office get a "first piece waiting for approval" notification, and the terminal shows that approval is pending. Quality approves or rejects it in the panel with a note. Who decided and when is kept, and a rejected first piece comes back to be filled in again. See production tracking software.

Frequently asked questions

Is this the same as an AS9102 or PPAP first article inspection?

No. A formal first article inspection (FAI) approves a new part or revision once, against every dimension on the drawing, and goes to the customer as a report. The first piece check here is the short check on the shop floor after every setup. This form is made for the second.

Who should approve the first article?

Usually quality control. In small shops without an inspector, a lead hand or a second person who did not do the setup approves it. What matters is that the person who set up the machine does not approve their own part alone.

What happens if the first article is rejected?

The setup is corrected, a new part is made and submitted again with the attempt number raised by one. The rejected part is logged as scrap. Write the reason in the note column, it helps the next time the same part comes back.

Is the wait for first article approval downtime?

Yes. It is setup downtime, and a loss that can be shortened. The downtime tracking template has a First-article approval reason ready for it.