Quality control checklist template for Excel (free)

A quality control checklist records which characteristics of a part were checked against which tolerance, the readings and the result. In this free Excel template you enter the nominal size and the tolerances, and the lower and upper limits, out-of-tolerance readings and the OK / NOK result are worked out by formulas. A summary sheet totals the results by inspection type and by work order.

Last updated: 8 November 2026

Who is it for?

Machining, sheet metal and assembly shops that write measurements on paper and keep inspection cards in binders. The same sheet works for in-process, final and incoming inspection. Once the readings are in one table, you can see which characteristic keeps running close to its limit.

Preview and download

The sample rows come from an in-process check of a Ø120 flange and a final check of a Ø40 shaft. The file takes up to five readings per characteristic. Below are the smallest and largest reading of each row.

CharacteristicNominalLower / upper limitSmallestLargestResult
Outer diameter Ø120 h8120.000119.946 / 120.000119.968119.990OK
Bore Ø60 H760.00060.000 / 60.03060.01060.034NOK
Overall length 25 ±0.125.00024.900 / 25.10024.96025.050OK
Surface appearance (visual)OK
Outer diameter Ø40 h740.00039.975 / 40.00039.98539.992OK

Excel (.xlsx), four sheets: inspection log, summary by inspection type and work order, lists of inspection types and gauges, and a detailed how-to. No email needed.

Download the template

In the Ø60 H7 bore row, the third reading of 60.034 is over the upper limit, so that cell turns red and the row's result is NOK. The Summary sheet also counts the file's further sample rows. One of the 5 in-process characteristics is NOK, a rate of 20%. In final inspection 1 of 4 is NOK, a burr found in a visual check.

How the limits and OK / NOK are worked out

The lower limit is the nominal plus the lower tolerance, and the upper limit is the nominal plus the upper tolerance. Enter the lower tolerance with a minus sign. This is how a callout on the drawing goes into the sheet:

On the drawingNominalLower tol.Upper tol.Limits
25 ±0.125-0.10.124.900 / 25.100
Ø40 h740-0.025039.975 / 40.000
Ø60 H76000.03060.000 / 60.030
Ra 1.6 max001.60 / 1.6

If even one reading in a row is outside the limits, the result is NOK. For a visual check, leave the nominal empty and write OK or NOK instead of a reading, and the result follows the same rule. Take the values for fits such as h7 and H7 from the ISO 286 tables or the drawing. The sheet does not look them up.

How to use it

  1. Edit the inspection types (incoming, in-process, final, first article) and your gauges on the Lists sheet.
  2. Add one row per characteristic measured, with the date, work order, part, operation, inspection type, characteristic and gauge.
  3. Enter the nominal and the tolerances. The lower and upper limits are calculated for you.
  4. Enter the readings. A reading outside the limits turns red and the row's result is NOK.
  5. Check the results by inspection type on the Summary sheet. For results by work order, type the work order number in a yellow cell.

When a spreadsheet stops being enough

On paper and in a spreadsheet, a reading is recorded when the inspector gets back to the sheet. By the time an out-of-limit value is noticed, the batch is often finished. And with readings spread over several files, it is hard to see which dimension is drifting over time.

In ModernMES, checklists come up on the operator terminal. A checklist can hold yes / no questions, number readings with a lower and upper limit, and text fields. It opens by itself at the start of a job, at the first piece, once a day per machine, every so many minutes of machine running time, or after a stop. A reading outside its limits or a "no" answer fails the checklist and notifies the people in the office. A nonconformance report (NCR) can be opened from a failed checklist, and the root cause, corrective and preventive actions are tracked there. Readings entered per characteristic in the panel are plotted on a control chart, with Cp and Cpk from 25 readings on. See production tracking software.

Frequently asked questions

What should a quality control checklist include?

The part, operation, inspection type, characteristic, nominal and tolerances, gauge, readings, result and inspector. Recording the gauge makes it easy to check its calibration when a result looks wrong.

What is the difference between in-process and final inspection?

In-process inspection happens while the batch is running, to catch a problem before it is finished. Final inspection happens once the part is done, before it ships. The check after a setup, before the run starts, is the first article inspection, and there is a first article inspection form for it.

How many parts should be measured?

If the customer or the control plan sets a sample size, follow it. If not, measuring a few parts at the start, middle and end of the batch on the critical dimensions is a good start. Each row takes five readings, so add a row for more.

What happens to a NOK part?

It is set aside and tagged, then reworked, scrapped or accepted under a concession. To log scrapped parts with their reason, use the scrap tracking template.