MRPeasy alternative: MRPeasy vs ModernMES compared
MRPeasy is cloud MRP software for small manufacturers. It brings bills of materials, stock, purchasing, sales and production planning into one place and is priced per user. ModernMES is an MES focused on running production on the shop floor. It records which job is on which machine and who has it, downtime, OEE and quality, and it works next to your ERP. This page compares the two. The MRPeasy details come from MRPeasy's own website, checked on 1 November 2026.
Last updated: 1 November 2026
The short answer
Look at MRPeasy if you have no ERP yet and want bills of materials, stock, purchasing, sales and the production plan in one system. Look at ModernMES if you already run an ERP or accounting software and what is missing is the shop floor side: who is on which job, why a machine stopped, OEE and quality records.
MRPeasy and ModernMES side by side
| MRPeasy | ModernMES | |
|---|---|---|
| What it is | MRP software for small manufacturers with 10 to 200 employees | MES for job shops and small and mid-sized plants |
| Price model | $49, $69, $99 or $149 per user per month for the first 10 users, then $79 a month for each further 10 users. One month free when paid yearly. | Plans with a machine and user limit, monthly or yearly. Operators who sign in at a terminal do not count as users. Current prices are below. |
| Data from the floor | Workers report on a shared kiosk screen or on their own production plan screen. Machine connections are not listed on the site. | Operators start, pause and finish jobs on a terminal or phone. Optional machine signals over HTTP or MQTT. |
| Downtime reasons | Not listed on the site | Operators pick a reason when pausing. With signals, stops nobody recorded open as unexplained stops. |
| OEE | A workstation report calculated from reported times and quantities | OEE per machine, from operator records and machine signals |
| Bill of materials | Multi-level, on all plans | Multi-level, in the stock module on Professional and up |
| Stock and purchasing | Stock and purchasing on all plans | Stock module on Professional and up. No purchasing. |
| Sales and invoicing | CRM, quotes and invoicing on all plans | Quotes and delivery notes, no invoicing |
| Quality | Quality control on Professional and up | Quality checks, defect types and SPC on all plans, nonconformance reports on Professional and up |
| Maintenance | On Enterprise and up | Maintenance plans, maintenance orders and overdue alerts, on Professional and up |
| Traceability | Lot tracking on all plans, serial numbers on Professional and up | Material and production lots, genealogy, lot labels, on Enterprise |
| Scheduling | Operation scheduling, capacity planning and a Gantt chart on all plans | A planning board that places jobs on machines over time, on Professional and up |
| API | REST API and webhooks on the Unlimited plan only | API keys and webhooks on Enterprise. The ERP connection is included in Enterprise and can be added to the other plans. |
| Where it runs | Cloud, no installation | Cloud, or your own server |
| Free trial | 15 + 15 days | 14 days |
| Languages | 33 interface languages, including Turkish and Hungarian. Support in English only. | Turkish, English, German, Hungarian and Italian |
Where MRPeasy is stronger
- It works as an ERP on its own. Multi-level bills of materials, material requirements planning, purchasing, stock, sales and invoicing are in one system.
- It has ready connections to accounting and e-commerce apps such as QuickBooks, Xero, Shopify and WooCommerce.
- It has iOS and Android apps.
- The trial runs for 15 + 15 days.
Where ModernMES is stronger
- It goes deeper on the shop floor. Downtime reasons, machine signals, OEE from real stops, SPC are in the core product. Nonconformance reports come with Professional.
- Operators do not count as users, so the price does not grow with the number of people on the floor.
- It works next to the ERP you already have. Ready connections cover Logo, Mikro, Netsis, DIA, Paraşüt, SAP, Business Central and Odoo, and finished work and scrap are booked in the ERP.
- It can be installed on your own server.
ModernMES is not an ERP. It has no purchasing, invoicing or accounting and does not calculate material requirements. If you need those and have no ERP, take that into account.
ModernMES prices
The smallest plan, Starter, costs €27.99 / $29.99 a month for 5 machines and 3 users, or €23.25 / $24.92 a month billed yearly. Professional costs €59.99 / $64.99 a month for 25 machines and 15 users, or €49.92 / $54.08 a month billed yearly. Enterprise costs €115 / $125 a month for unlimited machines and unlimited users, or €95.83 / $104.17 a month billed yearly. With all 25 machines in use, Professional works out to €2.40 / $2.60 per machine per month. There is no setup fee, operators who sign in at a terminal do not count as users, and every plan comes with a 14-day free trial. Prices exclude taxes.
MRPeasy's site shows its prices with a $ sign only and does not say whether tax is included. There is a wider comparison in MES software pricing.
How to decide
- Check whether you have an ERP. If you do, fill the gap on the shop floor rather than setting up a second stock and purchasing system.
- Count the people who will sign in. With per-user pricing, shop floor workers count too.
- Write down the real problem. Is material late, or can you not see where work gets stuck on the floor?
- Try both with your own data during the trials. MES vs MRP and how to choose MES software help.
Frequently asked questions
Is MRPeasy an MES?
MRPeasy calls itself MRP software for small manufacturers. It has a kiosk screen for shop floor workers and an OEE report per workstation, but the data comes from the times and quantities workers report. Machine connections and downtime reasons are not listed on its site.
Can ModernMES replace MRPeasy?
Partly. Shop floor tracking, quality, maintenance, lot traceability, quotes and delivery notes are in ModernMES. Maintenance is on Professional and lot traceability on Enterprise. Purchasing, invoicing, accounting and material requirements planning are not, and for those you need an ERP or accounting software.
Can MRPeasy and ModernMES be used together?
There is no ready-made connection between them. MRPeasy has an API on its Unlimited plan and ModernMES has a generic JSON connection in its ERP add-on, so one can be built, but it is a separate piece of work.
Related pages
- MES vs MRP: What Each One Does and How They Work TogetherWhat is the difference between MES and MRP? MRP plans material needs, an MES records what happens on the shop floor. A comparison table, how they work together and which one to start with.
- MES vs ERP: Differences and How They Work TogetherMES vs ERP vs MOM explained: where the line sits in ISA-95, a side-by-side comparison, what data flows between ERP and MES systems, and which a small shop needs first.
- MES Software Pricing 2026: Average Cost per Machine, User and SetupWhat does MES software cost on average? Published prices run €190 to €320 per machine a month for shop floor monitoring and $49 to $149 per user for cloud MRP. Setup, hidden costs, discounts and ModernMES prices.
- How to Choose MES Software: Options, Vendors, PricingHow to choose MES software: enterprise, ERP add-on and SaaS options, cloud vs on-premise, questions for MES vendors, pricing models and a trial plan.