Manufacturing glossary
Short definitions of the terms that come up most on the shop floor and in production software. OEE, takt time, cycle time, MES, ERP, MRP, SCADA, MTBF, MTTR and more, in plain language. You can link to each term, and where there is more to say, follow the link to the full guide.
Last updated: 30 October 2026
Availability
One of the three OEE factors. It shows how much of planned production time the machine actually ran, as run time divided by planned production time. Unplanned stops such as breakdowns, setups and waiting lower it.
Which stops count is covered in how to calculate availability for OEE.
Bill of materials (BOM)
The list of subassemblies, parts and materials that make up a product, with their quantities. MRP calculates material needs from the BOM, while the routing says how the parts are made.
Bottleneck
The machine or station with the most heavily loaded capacity among those a job passes through. The bottleneck sets the output of the whole shop, so an hour lost there is an hour lost for everyone.
Why downtime costs most at the bottleneck is covered in the downtime cost calculator.
Capacity utilization
The workload assigned to a resource in a period divided by its effective capacity in the same period. Above 100% means the work will not be done in that period. In job shops, around 85% leaves room for rush jobs and breakdowns.
Cycle time
The time a machine or station takes to finish one part and move on to the next, including loading, processing and unloading but not setup. Cycle time has to be shorter than takt time to meet demand.
The difference from takt time is covered in takt time vs cycle time.
Downtime reason
A record, picked from a predefined list, of why a machine stopped. Breakdowns, setups, waiting for material and no operator are typical reasons. A good list is short, and every reason is clearly planned or unplanned.
In ModernMES, operators pick the reason when they pause a job, and the reasons and their categories are edited in the settings. How to build the list is covered in the machine downtime tracking guide.
ERP
Enterprise resource planning. Software that runs the business side of a company, such as accounting, sales, purchasing, inventory and finance. It says what to produce, but usually does not follow how the work actually goes on the shop floor.
How ERP and MES split the work is covered in MES vs ERP.
ISA-95
The international standard (IEC 62264) that defines the layers between business systems and production control systems and the data that flows between them. It puts ERP at the business planning level, MES at the manufacturing operations level, and SCADA and PLCs at the control level.
Where MES sits in the model is covered in what is MES.
Lead time
The total time from receiving an order to delivering it. Because it includes time spent in queues and waiting as well as processing, it is far longer than the cycle time.
How it differs from takt and cycle time is covered in takt time vs cycle time.
Lot traceability
Being able to trace a product back to the material batch it came from, the machine it was made on, who made it and when. When a complaint comes in, it also finds the other products affected.
How to set it up is covered in the lot traceability guide.
Machine data collection
Taking a machine's state (running, stopped, in alarm) and values such as part counts directly from the machine, through a PLC, a sensor or the machine's controller. It removes the delay and the gaps of manual entry.
ModernMES can take machine signals over HTTP or MQTT. See API and webhooks.
MES
Manufacturing execution system. Software that follows and records production from the moment a work order is released to the shop floor until the part is finished. It answers who did which job, on which machine, in how long, with how many good parts and how much scrap.
What it does is covered in what is MES.
MRP
Material requirements planning. It works out which materials are needed, how much and when, from sales orders and the bill of materials. It is usually a module of an ERP and does not follow how work actually goes on the shop floor.
How it differs from an MES is covered in MES vs MRP.
MTBF
Mean time between failures. Total run time divided by the number of breakdowns. A rising MTBF means the machine breaks down less often.
How it is used with MTTR is covered in the machine downtime tracking guide.
MTTR
Mean time to repair. Total breakdown time divided by the number of breakdowns. A falling MTTR means breakdowns are being fixed faster.
There is a worked example in the machine downtime tracking guide.
OEE
Overall equipment effectiveness. It shows how much of a machine's planned production time went into making good parts, as availability × performance × quality.
The formula and an example are in how to calculate OEE, and the calculator is on the OEE calculator page.
Pareto analysis
Sorting losses from largest to smallest and working on the top few first. In downtime and scrap, a few causes usually account for most of the loss.
How it applies to downtime is covered in the machine downtime tracking guide.
Performance
One of the three OEE factors. It shows how fast the machine produced while it was running compared with its ideal speed, as total count × ideal cycle time divided by run time. Short stops and running slow lower it.
The calculation is covered in how to calculate performance for OEE.
Quality rate
One of the three OEE factors. Parts that were good the first time divided by all parts made. Reworked parts do not count as good.
Try it in the OEE calculator.
Routing
The list of operations a part goes through, in order. Each operation has a machine or machine group, a setup time and a time per piece.
How the routing fits into a work order is covered in work order tracking.
SCADA
Supervisory control and data acquisition. A system that monitors and controls machines, lines and plants in real time through signals, alarms and setpoints. It does not hold production information such as work orders, operators or customer orders.
Where SCADA sits in ISA-95 is covered in what is MES, and how it differs from an MES in MES vs SCADA.
Scrap rate
The share of parts made that go to scrap or rework, as scrap count divided by total count. Scrap wastes the machine time spent on the part as well as the material.
To log scrap by reason, download the scrap tracking template.
Setup time
The time spent getting a machine ready for a job, including fixtures, tools, loading the program, zeroing and the first-part check. It is spent once whatever the quantity, so in small batches it can be most of the cost. Also called changeover time.
How setup time affects a quote is covered in job shop quoting.
Shop floor terminal
The screen next to the machine where the operator starts, pauses and finishes jobs. It can be a tablet, a touch PC or a phone, and it replaces the paper job sheet.
In ModernMES, operators sign in on the terminal or their phone with a badge and start a job by scanning the barcode or QR code on the job card. Moving off paper is covered in the paperless MES guide.
Six big losses
The losses that lower OEE, grouped into six. Breakdowns and setups lower availability, short stops and running slow lower performance, and startup scrap and production scrap lower quality.
How each is measured is covered in how to calculate OEE.
Takt time
How often a part has to come off the line to meet customer demand, as available working time divided by demand. It does not depend on the machine.
Work it out for your own numbers in the takt time calculator.
Work in progress (WIP)
Parts that have been started but not finished and are waiting between operations. A lot of WIP means lead time is growing and work is piling up somewhere, usually in front of the bottleneck.
Work order
The instruction to make something on the shop floor. It says which part, how many, through which operations, on which machine and by when. Many shops use it interchangeably with production order.
Statuses and tracking are covered in work order tracking.
Related pages
- What Is MES? Manufacturing Execution System ExplainedMES stands for manufacturing execution system. What an MES system does on the shop floor, how it differs from ERP and MRP, and what to look for when choosing one.
- How to Calculate OEE: OEE Formula and Calculation ExampleThe OEE formula (availability × performance × quality), a step-by-step worked example on a CNC lathe, the six big losses, common mistakes and a free calculator.
- Takt Time Calculator: Takt Time vs Cycle TimeFree takt time calculator. Get takt time from available time and demand, compare it with cycle time and see whether you can meet demand. Takt vs cycle vs lead time, with an example.
- Machine Downtime Tracking: Downtime Reasons and AnalysisHow to track machine downtime: a short list of downtime reasons, paper vs Excel vs software, Pareto analysis, MTTR and MTBF, and common mistakes.